,,,,Area C,,,,,, ,Type of,2002,,,,,,,, PHASE,Context,context numbers,,,,,,,, LATEST PHASE,,,,,,,,,, CH,mole drain,1003,,,,,,,, CG,Robbing of Building 4,1021,1034,1034.2,1034.3,1034.4,1037,1037.2,1049, ,,1049.2,1049.3,,,,,,, CF,Building 4,,1032,,,,1149,,1096,1097 ,CF mostly flint postholes,,1073,,,1070,1151,,1182, ,,,1110,1077,,1069,1020,1125,1068, ,tiles and gully,1079,1172,,,,,,, ,grd assoc bldg 4 ,1057,,,,,,,, CE,under Bldg 4,1179,1179.2,1051,1176,,,,, ,rubbish pit,1145,1145.2,,,,,,, CD,gen southern spreads,1040,1040.2,1030,,,,,, ,above timber bldg,1043,1044,1076,1030.2,1028,1029,1100,1039,1039.2 ,,,,,1080,1081,1081.2,1112,1119, ,midden; oyster gully,1098,1098.2,1098.3,1098.4,1189,,,, ,stone spreads,1126,1126.2,,1178,1127,,,, ,northern pits,1150,1141,1124,1124.2,,,,, CC3,third phase gullies,1115,,,,,,,, CC2,second phase gullies,,1065,1099,1133,1134,,,, ,timber building,1188,1066,,,1109,,,, ,big circular pit,1173,1181,1136,,,,,, CC1,first phase gullies,1061,1123,1048,1190,1108,1114,1120,, ,CC1 postholes,1106,1107,,,,,,,1046 ,,1050,,,1091,,1138,,, ,,,,,,,1078,,, ,early gully or pit,1098.5,,,,,,,, ,above early ditch,1094,1144,1047,1082,1083,,,, CB,early ditch capping,1047.2,1122; .2-.7,1071,1121,1121.1,1121.3,1121.2,1121.4, CA2,occupation?,1131,1143,1130,,,,,, CA1,early ditch silts,1137,1140,1084,1183,1132,1093,1139,1146,1184 EARLIEST PHASE Please identify all finds per individual context; then merge contexts together by sub-phase to provide final report by phases "Phases are: CA, CB, CC1, CC2, CC3, CC4, CD, CE, CF, CG" The relevant 1999 contexts from Area B dug in 1999 are in the column in the far right. To do: go through each phase and check in contexts book and pottery report and then ensure consistency with matrix