A list of discreet programmes of work that have been carried out as part of research associated with Phase Two of the Channel Tunnel Rail Link (CTRL) project, later known as High Speed 1. These are arranged according into the hierachical/thematic Scheme Wide Results, Assessment Summaries, Scheme Wide Specialist Reports and Scheme Wide Research Reports. Alongside these programmes can be found material relating to the Phase Two Principle Sites and reported in a series of Integrated Reports, Building Surveys and Post Excavation Reports.
Added to this is a list of discreet interventions carried out as part of Phase One of the Channel Tunnel Rail Link (CTRL) project, later known as High Speed 1.
Site Name |
Project type |
Scheme Wide Programme |