Graphics ID no.,spot level no.,Vicus TBM 0.00 m,Vicus Zone,Vicus Zone room,trench,context,feature,description,source,Notes, 1,1,0.77,H,H4,1,,,Plan. ,drawing,"W56=+1.602, BS 0.63, IH = 2.23", 1,2,0.69,H,H4,1,,,,,, 1,3,0.54,H,H4,1,,,floor foundation,,, 1,4,0.57,H,H4,1,,,floor foundation,,, 1,5,0.55,H,H4,1,,,floor foundation,,, 1,6,0.64,H,H4,1,,,,,, 1,7,0.55,H,H4,1,,,level before cleaning of gully,,, 1,8,0.3,H,H4,1,,,,,, 1,9,0.36,H,H4,1,,,,,, 1,10,0.61,H,H4,1,,,,,, 1,11,0.62,H,H4,1,,,,,, 1,12,0.8,H,H4,1,,,,,, 1,13,0.33,H,H4,1,,,,,, 1,14,0.45,H,H4,1,,,,,, 1,15,0.73,H,H4,1,,,,,, 1,16,0.73,H,H4,1,,,,,, 1,17,0.64,H,H4,1,,,,,, 1,18,0.68,H,H4,1,,,,,, 1,19,0.535,H,H4,1,,,,drawing,"W56 = +1.602, 0.69, IH = 2.29", 1,20,0.56,H,H4,1,,,,,, 1,21,0.5,H,H4,1,,,,,, 1,22,0.64,H,H4,1,,,,,, 1,23,0.52,H,H4,1,,,,,, 2,1,0.65,H,H4,2,,,"Plan. ""W"" is plinth in A - TBM 0.00",drawing,"W = 0.00, BS, 2.23, IH = 2.23", 2,2,0.63,H,H4,2,,,,,, 2,3,0.56,H,H4,2,,,,,, 2,4,0.49,H,H4,2,,,,,, 2,5,0.655,H,H4,2,,,,,, 2,6,0.67,H,H4,2,,,,,, 2,7,0.57,H,H4,2,,,,,, 2,8,0.57,H,H4,2,,,,,, 2,9,0.595,H,H4,2,,,,,, 2,10,0.49,H,H4,2,,,,,, 2,11,0.55,H,H4,2,,,,,, 2,12,0.475,H,H4,2,,,,,, 2,13,0.445,H,H4,2,,,,,, 2,14,0.32,H,H4,2,,,,,, 2,15,0.59,H,H4,2,,,,,, 2,16,0.55,H,H4,2,,,,,, 2,17,0.45,H,H4,2,,,,,, 2,18,0.44,H,H4,2,,,,,, 2,19,0.47,H,H4,2,,,,,, 2,20,0.66,H,H4,2,,,,,, 2,21,0.51,H,H4,2,,,,,, 2,22,0.575,H,H4,2,,,,,, 2,23,0.47,H,H4,2,,,,,, 4,1,0.64,H,H4,2,,,Plan 3,drawing,"TBM 0.00, BS 2.04, IH =2.04", 4,2,0.14,H,H4,2,,,,,, 4,3,0.62,H,H4,2,,,,,, 4,4,0.21,H,H4,2,,,,,, 4,5,0.63,H,H4,2,,,,,, 4,6,0.55,H,H4,2,,,,,, 4,7,0.49,H,H4,2,,,,,, 4,8,-0.05,H,H4,2,,,,,, 4,9,0.36,H,H4,2,,,,,, 4,10,0.44,H,H4,2,,,,,, 4,11,0.11,H,H4,2,,,,,, 4,12,0.05,H,H4,2,,,,,, 4,13,0.36,H,H4,2,,,,,, 4,14,0.07,H,H4,2,,,,,, 4,15,0.15,H,H4,2,,,,,, 4,16,0.13,H,H4,2,,,,,, 4,17,0.43,H,H4,2,,,,,, 4,18,0.27,H,H4,2,,,,,, 4,19,0.03,H,H4,2,,,,,, 4,20,0.26,H,H4,2,,,,,, 4,21,0.07,H,H4,2,,,,,, 4,22,-0.21,H,H4,2,,,,,, 4,23,-0.01,H,H4,2,,,,,, 4,24,0.21,H,H4,2,,,,,, 4,25,0.23,H,H4,2,,,,,, 4,26,0.47,H,H4,2,,,,,, 4,27,0.48,H,H4,2,,,,,, 5,1,0.275,H,H4,3-4,,,Plan. Limit of excavation,drawing,"TBM 0.00, BS 2.11, IH = 2.11", 5,2,0.315,H,H4,3-4,,,limit of excavation,,, 5,3,0.245,H,H4,3-4,,,limit of excavation,,, 5,4,0.23,H,H4,3-4,,,limit of excavation,,, 5,5,0.26,H,H4,3-4,,,limit of excavation,,, 5,6,0.45,H,H4,3-4,,,limit of excavation,,, 5,7,0.44,H,H4,3-4,,,limit of excavation,,, 5,8,0.495,H,H4,3-4,,,root,,, 5,9,0.81,H,H4,3-4,,,root,,, 5,10,0.66,H,H4,3-4,2,,top,,, 5,11,0.76,H,H4,3-4,2,,top,,, 5,12,0.73,H,H4,3-4,3,,,,, 5,13,0.65,H,H4,3-4,4,,,,, 5,14,0.53,H,H4,3-4,5,,,,, 5,15,0.46,H,H4,3-4,6,,,,, 5,16,0.515,H,H4,3-4,7,,,,, 5,17,0.44,H,H4,3-4,7,,,,, 5,18,0.745,H,H4,3-4,2,,,,, 5,19,0.74,H,H4,3-4,3,,,,, 5,20,0.645,H,H4,3-4,3,,,,, 5,21,0.535,H,H4,3-4,2,,,,, 5,22,0.79,H,H4,3-4,,,baulk,,, 5,23,0.82,H,H4,3-4,,,baulk,,, 6,1,0.06,H,H4,5,3,,plan. Limit of excavation,drawing,"TBM 0-00, BS 2.04, IH = 2.04", 6,2,0.06,H,H4,5,3,,limit of excavation,,, 6,3,0.39,H,H4,5,2,,,,, 6,4,0.42,H,H4,5,2,,,,, 6,5,0.35,H,H4,5,4,,wall,,, 6,6,0.39,H,H4,5,4,,,,, 6,7,0.36,H,H4,5,,,,,, 6,8,0.32,H,H4,5,4,,,,, 6,9,0.13,H,H4,5,,,inner step to north of [5],,, 6,10,0.19,H,H4,5,,,inner step to north of [5],,, 6,11,0.25,H,H4,5,5,,,,, 6,12,0.28,H,H4,5,4,,,,, 6,13,0.21,H,H4,5,,,limit of excavation,,, 6,14,0.21,H,H4,5,,,limit of excavation,,, 6,15,0.33,H,H4,5,4,,,,, 6,16,0.29,H,H4,5,4,,,,, 6,17,0.22,H,H4,5,4,,,,, 6,18,0.13,H,H4,5,4,,,,, 6,19,0.22,H,H4,5,,,limit of excavation,,, 6,20,0.11,H,H4,5,,,limit of excavation,,, 6,21,0.12,H,H4,5,,,limit of excavation,,, 6,22,0.16,H,H4,5,,,limit of excavation,,, 6,23,0.22,H,H4,5,6,,,,, 6,24,0.01,H,H4,5,6,,,,, 6,25,0.07,H,H4,5,6,,,,, 6,26,0.14,H,H4,5,6,,,,, 6,27,0.24,H,H4,5,4,,,,, 6,28,0.22,H,H4,5,,,limit of excavation,,, 6,29,0.29,H,H4,5,4,,,,, 6,30,0.1,H,H4,5,,,limit of excavation,,, 6,31,0.32,H,H4,5,2,,,,, 7,1,0.46,H,H4,7,,,Plan. Limit of excavation,drawing,"TBM 0.00, BS 2.04, IH = 2.04 m", 7,2,0.83,H,H4,7,,,baulk,,, 7,3,0.46,H,H4,7,,,limit of excavation,,, 7,4,0.5,H,H4,7,,,,,, 7,5,0.43,H,H4,7,,,,,, 7,6,0.45,H,H4,7,,,wall,,, 7,7,0.64,H,H4,7,,,wall,,, 7,8,0.66,H,H4,7,,,wall,,, 7,9,0.6,H,H4,7,,,wall,,, 7,10,0.67,H,H4,7,,,wall,,, 7,11,0.68,H,H4,7,,,wall,,, 7,12,0.71,H,H4,7,,,wall,,, 7,13,0.62,H,H4,7,,,wall,,, 7,14,0.71,H,H4,7,,,wall,,, 7,15,0.43,H,H4,7,,,limit of excavation,,, 7,16,0.56,H,H4,7,,,limit of excavation,,, 7,17,0.58,H,H4,7,,,limit of excavation,,, 87,1,0.18,H,H5,8,9,,,drawing,"W72 = +0.806, BS 1.63, IH =2.44", 87,2,0.48,H,H5,8,3,,,,, 87,3,0.44,H,H5,8,3,,,,, 87,4,0.52,H,H5,8,3,,,,, 87,5,0.64,H,H5,8,3,,,,, 87,6,0.42,H,H5,8,3,,,,, 87,7,0.42,H,H5,8,7,,,,, 87,8,0.48,H,H5,8,7,,,,, 87,9,0.46,H,H5,8,7,,,,, 87,10,0.47,H,H5,8,7,,,,, 87,11,0.34,H,H5,8,8,,,,, 87,12,0.26,H,H5,8,8,,,,, 87,13,0.45,H,H5,8,7,,,,, 87,14,0.49,H,H5,8,7,,,,, 87,15,0.52,H,H5,8,7,,,,, 87,16,0.45,H,H5,8,7,,,,, 87,17,0.46,H,H5,8,7,,,,, 87,18,0.47,H,H5,8,7,,,,, 87,19,0.48,H,H5,8,7,,,,, 87,20,0.67,H,H5,8,5,,,,, 87,21,0.66,H,H5,8,5,,,,, 87,22,0.62,H,H5,8,5,,,,, 87,23,0.6,H,H5,8,4,,,,, 87,24,0.6,H,H5,8,4,,,,, 87,25,0.67,H,H5,8,4,,,,, 87,26,0.67,H,H5,8,4,,,,, 87,27,0.64,H,H5,8,4,,,,, 87,28,0.68,H,H5,8,4,,,,, 87,29,0.56,H,H5,8,4,,,,, 87,30,0.53,H,H5,8,6,,,,, 87,31,0.64,H,H5,8,6,,,,, 87,32,0.8,H,H5,8,,,baulk,,, 87,33,0.73,H,H5,8,,,baulk,,, 87,34,0.64,H,H5,8,,,baulk,,, 87,35,0.84,H,H5,8,,,baulk,,, 87,36,0.46,H,H5,8,12,,,drawing,"W72 =+0.806, BS 1.49, IH, 2.3", 87,37,0.48,H,H5,8,12,,,,, 87,38,0.28,H,H5,8,13,,,,, 87,39,0.16,H,H5,8,13,,,,, 87,40,0.11,H,H5,8,13,,,,, 87,1,-0.56,H,H5,9,,,Plan. Limit of excavation,drawing,"W72 = +0.806, BS 1.61, IH = 2.42", 87,2,-0.48,H,H5,9,9,,foundation offset wall [9],,, 87,3,0.5,H,H5,9,9,,top of wall [9],,, 87,4,0.7,H,H5,9,10,,,,, 87,5,0.84,H,H5,9,,,baulk,,, 87,6,0.81,H,H5,9,,,baulk,,, 88,1,0.22,H,H5,8,11,,Plan 2.,,, 88,2,0.02,H,H5,8,10,,,,, 88,3,0.18,H,H5,8,11,,,,, 88,4,0.23,H,H5,8,10,,,,, 88,5,-0.31,H,H5,8,17,,,drawing,"W72 =+0.806, BS 1.52, IH = 2.326", 88,6,-0.38,H,H5,8,17,,,,, 88,7,-0.415,H,H5,8,17,,,,, 88,8,-0.426,H,H5,8,17,,,,, 88,9,-0.43,H,H5,8,17,,,,, 88,10,-0.4,H,H5,8,17,,,,, 89,1,-0.42,H,H5,8,22,,Plan 3,drawing,"W72 = +0.806, BS 1.61, IH = 2.42 m", 89,2,-0.43,H,H5,8,22,,,,, 89,3,-0.42,H,H5,8,22,,,,, 89,4,0.09,H,H5,8,10,,,,, 89,5,-0.31,H,H5,8,17,,,,, 89,6,-0.38,H,H5,8,17,,,,"W72 =+0.806, BS 1.52, IH = 2.3", 89,7,-0.415,H,H5,8,17,,,,, 89,8,-0.426,H,H5,8,17,,,,, 89,9,-0.43,H,H5,8,17,,,,, 89,10,-0.4,H,H5,8,17,,,,, 90,datum,0.73,H,H5,8,,,Section drawing datum line,drawing,"W72 =+0.806, BS 1.523, IH = 2.33", 90,datum,0.69,H,H5,8,19-20,,Section drawing datum line,drawing,"W72 =+0.806, BS 1.615, IH = 2.42", 91,datum,0.72,H,H5,8,,,Section drawing datum line,drawing,"W72 =+0.806 BS 1.55, IH = 2.36", 92,datum,0.73,H,H5,8,,,Elevations,drawing,"W72 =+0.806, BS 1.523. IH = 2.33", 93,datum,0.72,H,H5,9,9,,section/elevation drawing datum line - level is recorded on 87,drawing,W72 =+0.806; BS 1.61; IH =2.42, 94,datum,2.28,H,H5,10,,,section drawing datum line,drawing,W72= 0.806; BS 1.47; IH 2.28, 94,1,-0.33,H,H5,10,8,,plan. convex tile bottom of 7,,W72= 0.806; BS 1.47; IH 2.28, 94,2,-0.32,H,H5,10,8,,,,, 94,3,-0.32,H,H5,10,8,,,,, 94,4,-0.29,H,H5,10,8,,,,, 94,5,-0.25,H,H5,10,8,,,,, 94,6,-0.24,H,H5,10,6,,,,, 94,7,-0.36,H,H5,10,6,,,,, 94,8,-0.25,H,H5,10,6,,,,, 94,9,-0.06,H,H5,10,6,,,,, 94,10,0.03,H,H5,10,4,,,,, 94,11,0.25,H,H5,10,4,,,,, 94,12,0.16,H,H5,10,4,,,,, 94,13,0.19,H,H5,10,4,,,,, 94,14,0.21,H,H5,10,4,,,,, 94,15,0.05,H,H5,10,5,,,,, 94,16,0.55,H,H5,10,,,baulk,,, 94,17,0.49,H,H5,10,,,baulk,,, 94,18,0.46,H,H5,10,,,baulk,,, 94,19,0.6,H,H5,10,,,baulk,,, 94,20,-0.25,H,H5,10,6,,,,, 94,21,0.02,H,H5,10,4,,"underside of quoin, top of [3]",,, 94,22,-0.07,H,H5,10,4,,"underside of quoin, top of [3]",,, 177,,-0.27,H,1988,test 1,,,concrete surface,drawing,TBM 0.00, 178,69,-0.86,H,,H3E,,,drain B concrete/tile over roof,,, 178,70,-0.9,H,,H3E,,,thin white cement to east of drain B roof,,, 178,73,-0.73,H,,H3SE,,,drain B concrete roofing,,, 178,74,-0.68,H,,H3SE,,,drain B concrete roofing,,, 178,75,-0.39,H,,H3SE,,,wall of SE corner H3 (top),,, 178,76,-0.27,H,,H3SE,,,"travertine cippus at SE corner H3, top (fractured)",,, 178,77,-0.76,H,,H3SE,,,drain B concrete roofing,,, 178,78,-0.74,H,,H3SE,,,drain B concrete roofing,,, 178,79,-0.68,H,,H3SE,,,concrete surface on south side H3 = surface [2] of H3S?,,, 178,80,-0.52,H,,H3SE,,,interior SE corner of H3,,, 179,,,H,H3,H3NW,,,levels listed are all converted to 0.00,drawing,TBM 0.00, 247,datum 1,0.05,H,H1-H2,2001,,,"section 1 drawing datum line. For ""TBM3"" read TBM2",drawing,"TBM 2 -0.20, BS 1.05, IH = 0.85", 247,datum 2,-0.1,H,H1-H2,2001,,,section 2 drawing datum line,,"TBM 2 -0.20, BS 1.08, IH = 0.88", 247,datum 3,-0.19,H,H1-H2,2001,,,section 3 drawing datum line,,"TBM 2 -0.20 BS 1.08, IH =0.88", 247,"""1.460""",-0.58,H,H1-H2,2001,,,elevation 4 ,,"TBM 2 -0.20 BS 1.08, IH =0.88", 247,"""1.537""",-0.657,H,H1-H2,2001,,,elevation 4 ,,"TBM 2 -0.20 BS 1.08, IH =0.88", 247,"""1.698""",-0.818,H,H1-H2,2001,,,elevation 4 ,,"TBM 2 -0.20 BS 1.08, IH =0.88", 248,,,H,H1-H2,2001,,,"Plan. Levels refer to context numbers. Subtract 0.88 from all levels. For ""TBM3"" read TBM2 ",,"TBM 2 -0.20 BS 1.08, IH =0.88", 249,datum,-0.33,H,H1-H3,2002,,,section drawing datum line,,"TBM 2 -0.20 BS 1.37, IH = 1.17", 284,1,-0.72,H,H3,H3SW,,,"plan, drawing no 20 extra levels (see also 297)",drawing,"TBM -0.20, BS 1.24, IH = 1.04", 284,2,-0.585,H,H3,H3SW,,,,,, 284,3,-0.55,H,H3,H3SW,,,,,, 284,4,-0.66,H,H3,H3SW,,,,,, 284,5,-0.595,H,H3,H3SW,,,,,, 284,6,-0.54,H,H3,H3SW,,,,,, 284,7,-0.42,H,H3,H3SW,,,,,, 284,8,-0.51,H,H3,H3SW,,,,,, 289,1,-0.29,H,H2,2002,106,,plan 9,drawing,TBM 2 -0.20 BS 1.13 IH 0.93, 289,2,-0.19,H,H2,2002,106,,plan 9,,, 289,1,-0.73,H,H2,2002,108,,plan 13,drawing,TBM 2 -0.20 BS 1.33 IH 1.13, 289,2,-0.73,H,H2,2002,108,,plan 13,,, 289,3,-0.76,H,H2,2002,108,,plan 13,drawing,TBM 2 -0.20 BS 1.34 IH 1.14, 290,1,-0.81,H,H2,2002,109-112-114,,plan 14,drawing,"TBM -0.20, BS 1.21, IH 1.01 ", 290,2,-0.79,H,H2,2002,109-112-114,,plan 14,,, 290,3,-0.76,H,H2,2002,109-112-114,,plan 14,,, 290,4,-0.765,H,H2,2002,109-112-114,,plan 14,,, 290,5,-0.755,H,H2,2002,109-112-114,,plan 14,,, 290,6,-0.74,H,H2,2002,109-112-114,,plan 14,,, 290,7,-0.76,H,H2,2002,109-112-114,,plan 14,,, 290,8,-0.745,H,H2,2002,109-112-114,,plan 14,,, 291,datum 1,-0.69,H,H2,2002,,,section drawing datum line ,drawing,"TBM -0.20, BS 1.155, IH 0.955", 292,SF 5,-0.85,H,H3,H3SW,12,,"plan. Numbers are set in triangles, small find numbers (coins)",drawing,"TBM -0.20, BS 1.11, IH = 0.91 ", 292,SF 6,-0.85,H,H3,H3SW,,,,,, 292,SF 7,-0.88,H,H3,H3SW,,,,,, 292,SF 8,-0.89,H,H3,H3SW,,,,,, 292,SF 9,-0.71,H,H3,H3SW,,,,,, 293,datum 1,-0.71,H,H2,2002,,,elevation drawing datum line,drawing,, 294,1,-0.7,H,H1,H1W,104-105,,plan 8,drawing,"TBM 2 -0.20, BS 1.26, IH = 1.06", 294,2,-0.7,H,H1,H1W,104-105,,,,, 294,3,-0.7,H,H1,H1W,104-105,,,,, 294,4,-0.74,H,H1,H1W,104-105,,,,, 294,1,-1.11,H,H1,H1W,110-111,,plan 18,drawing,"TBM2 = -0.20, BS 1.23, IH = 1.03", 294,2,-0.92,H,H1,H1W,110-111,,,,, 294,3,-0.88,H,H1,H1W,110-111,,,,, 294,4,-0.89,H,H1,H1W,110-111,,,,, 294,5,-0.875,H,H1,H1W,110-111,,,,, 294,1,-1.005,H,H1,H1W,119-121-117,,plan 19,drawing,"TBM2 =-0.20, BS 1.16, IH = 0.96", 294,2,-0.95,H,H1,H1W,119-121-117,,,,, 294,3,-1.58,H,H1,H1W,119-121-117,,,,, 294,4,-1.28,H,H1,H1W,119-121-117,,,,, 294,5,-1.38,H,H1,H1W,119-121-117,,,,, 294,6,-1.15,H,H1,H1W,119-121-117,,,,, 294,7,-1.21,H,H1,H1W,119-121-117,,,,, 294,8,-1.2,H,H1,H1W,119-121-117,,,,, 294,9,-1.17,H,H1,H1W,119-121-117,,,,, 296,1,-0.74,H,H3,H3SW,,,plan. Drain at SE corner ,drawing,"TBM -0.20, BS, 1.165, IH = 0.965", 296,2,-0.79,H,H3,H3SW,,,,,, 296,3,-0.785,H,H3,H3SW,,,,,, 296,4,-0.84,H,H3,H3SW,,,,,, 296,5,-0.885,H,H3,H3SW,,,,,, 297,IH,0.96,H,H3,H3SW,,,Plan overlay to 284. level nos 1-44 subtract 0.96 (or add 0.2 to reductions on drawing),,"TBM -0.20, BS 1.16, IH 0.96", 297,IH,1.01,H,H3,H3SW,,,"Levels nos 45-55, subtract 1.01 (or add 0.20 to reductions given) ",,, 298,,,H,H3,H3SW,,,"plan overlay to drawing 12. TBM 5 value unknown, probably close to TBM 2 =-0.20",,, 299,SF 2,,H,H3,H3SW,,,"drawing 10. Number is in traingle, so a coin, no level?",,, 300,1,-0.65,H,H3,H3SW,2,,plan ,,"TBM -0.20, BS 1.29, IH =1.09", 301,1,-0.575,H,H1,H1W,101,,"Plan 6. Add 20 cms to levels as reduced on plan. For ""TBM3"" read TBM2. ",drawing,"TBM2 =-0.20, BS 0.98, IH = 0.78", 301,2,-0.655,H,H1,H1W,101,,,,, 301,3,-0.645,H,H1,H1W,101,,,,, 301,4,-0.75,H,H1,H1W,101,,,,, 301,5,-0.63,H,H1,H1W,101,,,,, 301,6,-0.679,H,H1,H1W,101,,,,, 301,7,-0.625,H,H1,H1W,101,,,,, 301,8,-0.355,H,H1,H1W,101,,,,, 302,1,-0.32,H,H2,2002,,,plan,drawing,"TBM2 -0.20, BS 1.26, IH = 1.06", 302,2,-0.26,H,H2,2002,,,,,, 302,3,-0.2,H,H2,2002,,,,,, 302,4,-0.09,H,H2,2002,,,,,, 302,5,-0.2,H,H2,2002,,,,,, 302,6,-0.21,H,H2,2002,,,,,, 302,7,-0.09,H,H2,2002,,,,,, 303,SF 2,,H,H3,H3SW,,,"plan. Drawing no 12. TBM 5, value unknown, probably close to TBM 2=- 0.20",,, 303,SF 3,,H,H3,H3SW,,,"Number in triangle is Small Find, coin",,, 304,1,-0.485,H,H1,H1W,,,sections. Drawing 21 datum line ,drawing,"TBM 2 -0.20, BS 1.21,IH = 1.01", 304,2,-0.87,H,H1,H1W,,,Drawing 22 datum line,,"TBM 2 -0.20, BS 1.21,IH = 1.01", 304,3,-0.52,H,H1,H1W,,,Drawing 23 datum line,,"TBM 2 -0.20 BS 1.24, IH 1.04", 326,1,0.2,H,1988,test 2 -3,,,,drawing,"TBM 0.00, BS 2.32, IH = 2.32", 326,2,0.57,H,1988,test 2 -3,,,,,, 326,3,0.55,H,1988,test 2 -3,,,,,, 326,4,0.43,H,1988,test 2 -3,,,,,, 326,5,0.443,H,1988,test 2 -3,,,,,, 326,6,0.235,H,1988,test 2 -3,,,,,, 331,datum,-0.62,H,,R,,,Section drawing datum line,drawing,"TBM 2 -0.20, BS 1.22, IH 1.02", 332,1,-0.96,H,,R,11,,"roof of drain near NW corner of trench, note: apex of drain tile roof on south side of shaft is noted on plan as 18 cms above level 6 = -0.94 ",drawing,"TBM2 = -0.20, BS 1.28, IH = 1.08", 332,2,-0.47,H,H3,R,,floor,mosaic tesserae surface,,, 332,3,-0.5,H,H3,R,,floor,cement bedding of mosaic ,,, 332,4,-0.37,H,H3,R,,east wall,point on core of east wall,,, 332,5,-0.49,H,,R,14,,brick capping of drain inspection shaft,,, 332,6,-1.12,H,,R,14,,limit of excavation of shaft = apex of drain roof north side,,, 332,7,-0.75,H,,R,14,,NE corner of concrete surround of drain shaft,,, 332,8,-1,H,,R,11,,"drain roof, lower level in construction",,, 332,9,-0.82,H,,R,10,,"top of mortar surface, to east of drain ",,, 332,10,-1.15,H,,R,8,,bottom of pit (probably overcut),,, 332,11,-1.15,H,,R,3/8,,area of burnt material at junction of gully [3] and pit [8],,, 332,12,-0.8,H,,R,9,,top of mortar surface [9] in extension ,,, 332,13,-0.76,H,,R,9,,top of mortar surface [9] at eastern edge (near [5]),,, 332,1,-0.96,H,,R,,,Plan,drawing,"TBM2 = -0.20, BS 1.28, IH = 1.08", 332,2,-0.47,H,,R,,,,,, 332,3,-0.5,H,,R,,,,,, 332,4,-0.37,H,,R,,,,,, 332,5,-0.49,H,,R,,,,,, 332,6,-1.12,H,,R,,,,,, 332,7,-0.75,H,,R,,,,,, 332,8,-1,H,,R,,,,,, 332,9,-0.84,H,,R,,,,,, 332,10,-1.15,H,,R,,,,,, 332,11,-1.15,H,,R,,,,,, 332,12,-0.8,H,,R,,,,,, 332,13,-0.76,H,,R,,,,,, 332,"""1.17""",?,H,,R,,,these are converted to 0.00?,,, 332,"""1.19""",?,H,,R,,,these are converted to 0.00?,,, 178,47,-0.79,H3,,R,NE corner,,level of tufelli foot of wall ,,, 178,57,-0.38,H3,,R,,,"NE corner of H3, tufa block (tufello) course east side ",,, 178,58,-0.48,H3,,R,,,North wall of H3 core,,, 178,59,-0.47,H3,,R,,,mosaic floor in NE corner H3 tesserae level,,, 178,60,-0.49,H3,,R,,,"mosaic floor NE corner H3, bedding",,, 178,66,-0.51,H3,,H3E,,,"mosaic floor H3, bedding",,, 178,67,-0.46,H3,,H3E,,,"mosaic floor H3, tesserae",,, 178,68,-0.33,H3,,H3E,,,"east wall H3, top ",,, 178,72,-0.7,H3,,H3SE,,,thin white cement to east of drain B roof,,, 178,85,-0.49,H3,,,south wall,,"concrete at east end of doorway, bedding for threshold",,, 178,86,-0.38,H3,,,south wall,,travertine block at foot of door jamb (top),,, 178,87,-0.53,H3,,,south wall,,"threshold of door, preserved height",,, 178,88,-0.64,H3/B,,H3S,,,concrete surface [1],,,