Graphics ID no.,spot level no.,Vicus TBM 0.00 m,Vicus Zone,Vicus Zone room,trench,context,feature,description,source,Notes, 450,,,X,XL,1997,,,"Plan 6 levels converted to TBM4, deduct 1.12 for 0.00 datum",drawing,TBM4=1.12, 451,,,X,XL,1997,, ,"Plan 8, levels converted to TBM4, deduct 1.12 for 0.00 datum",drawing,TBM4=1.12, 452,,,X,XL,1997,,,"Plan 10 levels converted to TBM4, deduct 1.12 for 0.00 datum",drawing,TBM4=1.12, 453,,,X,XL,1997,,,"Plan 11 levels converted to TBM4, deduct 1.12 for 0.00 datum",drawing,TBM4=1.12, 454,,,X,XL,1997,,,"Plan 12 levels converted to TBM4, deduct 1.12 for 0.00 datum",drawing,TBM4=1.12, 455,,,X,XL,1997,,,"Plan 13 levels converted to TBM4, deduct 1.12 for 0.00 datum",drawing,TBM4=1.12, 456,,,X,XL,1997,,,"Plan 15 levels converted to TBM4, deduct 1.12 for 0.00 datum",drawing,TBM4=1.12, 457,,,X,XL,1997,,,"plan 18 levels converted to TBM4, deduct 1.12 for 0.00 datum",drawing,TBM4=1.12, 458,,,X,XL,1997,,,"plan 20 levels converted to TBM4, deduct 1.12 for 0.00 datum",drawing,TBM4=1.12, 459,,,X,XL,1997,,,"plan 21 levels converted to TBM4, deduct 1.12 for 0.00 datum",drawing,TBM4=1.12, 460,,,X,XL,1997,,,"plan 22levels converted to TBM4, deduct 1.12 for 0.00 datum",drawing,TBM4=1.12, 461,,,X,XL,1997,,,"plan 23 levels converted to TBM4, deduct 1.12 for 0.00 datum",drawing,TBM4=1.12, 462,datum ,1.00,X,XL,1997,,,"Section. levels converted to TBM4, deduct 1.12 for 0.00 datum",drawing,TBM4=1.12, 463,datum,1.12,X,XL,1997,,,Section. upper red line = TBM4 +1.12 m ,drawing,TBM4=1.12, 464,datum,0.03,X,XL,1997,,,section drawing datum line,drawing,"TBM4=1.12, BS 0.96, IH 2.14", ,,,,,,,,,,, 342,,,X,X,1995,,,"plan 1, subtract TBM4 (1.12) from levels",drawing,TBM4=1.12, 226,datum,0.1,X,X,1995,,,section 7 datum line,drawing,TBM4=1.12, 226,datum,-0.38,X,X,1995,,,section 8 datum line,drawing,TBM4=1.12, 226,datum,-0.43,X,X,1995,,,section 9 datum line,drawing,TBM4=1.12, 226,datum,?,X,X,1995,,,section 10 not recorded,drawing,TBM4=1.12, 226,datum,?,X,X,1995,,,section 11 not recorded,drawing,TBM4=1.12, 226,datum,1.12,X,X,1995,,,section 12 TBM4 line,drawing,TBM4=1.12, 226,datum,1.12,X,X,1995,,,section 13 TBM4 line,drawing,TBM4=1.12, 227,datum,1.09,X,X,1995,,,section drawing datum line,drawing,"TBM4=1.12, BS 1.17, IH 2.31", 230,,,X,X,1996,,,"plan 1, subtract TBM4 (1.12) from levels",drawing,, 346,,,X,X,1996,,,"plan 3, subtract TBM4 (1.12) from levels",drawing,, 347,,,X,X,1996,,,plan 4. subtract IH 1.77,drawing,"TBM4=1.12,BS0.65,IH=1.77", 229,,,X,X,1996,,,plan 5. substract TBM4(1.12) from levels,drawing,, 349,datum,-0.58,X,X,1996,,,section drawing datum line,drawing,"TBM4=1.12, BS 0.83, IH=1.95", 350,datum,-1.005,X,X,1996,,,section drawing datum line,drawing,"TBM4=1.12, BS 0.83, IH=1.95", 351,datum,-0.24,X,X,1996,,,section drawing datum line TBM4 - 1.36,drawing,"TBM4=1.12, BS 1.36, IH=1.95", 355,datum,-0.59,X,X,1997,,,"section drawing no 17, 1997 datum line",drawing,"TBM4=1.12, BS 0.82, IH= 1.94", 355,datum,-0.76,X,X,1998,,,"section drawing no 17, 1998 datum line",drawing,"TBM4=1.12,BS 0.43, IH=1.55", 212,,,X,X,1997,,,plan 7. subtract IH 1.8 from FS levels,drawing,"TBM4=1.12,BS 0.68, IH=1.80", 213,,,X,X,1997,,,plan 9. Subtract IH 1.75 from FS levels,drawing,"TBM4=1.12, BS 0.63, IH=1.75", 214,,,X,X,1997,,,"plan 14. subtract IH 1.67 from FS, or 1.12 from RLs",drawing,"TBM4=1.12, BS 0.53, IH=1.67", 215,,,X,X,1997,,,plan 16. Subtract IH 1.75 from FS,drawing,"TBM4=1.12, BS 0.63, IH=1.75", 216,,,X,X,1997,,,plan 17. subtract IH 1.72 from FS levels,drawing,"TBM4=1.12, BS 0.60, IH=1.72", 348,,,X,X,1997,,,plan 19 subtract IH 1.69 from FS levels,drawing,"TBM4=1.12, BS 0.57, IH=1.69", 228,,,X-Y,XL-YA,1995,,,plan 2. Deduct TBM4 (1.12) from all levels,drawing,TBM4=1.12, 343,,,X-Y,YB,1995,,,addition to plan 2. Deduct TBM4 (1.12) from all levels,drawing,TBM4=1.12, 236,datum,1.12,X,X,,,,section drawing datum line,,TBM4=1.12, 485,datum,1.12,X,X,,,,section drawing datum line,,TBM4=1.12,