Graphics ID no.,spot level no.,Vicus TBM 0.00 m,Vicus Zone,Vicus Zone room,trench,context,feature,description,source,Notes, 242,datum,1.18,Y,YG,2004,,,section/elevation. TBM YG=1.18,drawing,TBM YG=1.18, 286,1,,Y,YG,2002,,,"plan 1. TBM ""6.29"" = 1.29 above 0.00 No backsight or level taken?",drawing,"TBM ""6.29"" = +1.29 (Vicus 0.00 datum was revalued by RC at 5 m)", 287,1,0.26,Y,YG,2002,,,"plan 2. TBM ""6.29"" = 1.29 above 0.00",drawing,TBM 1.29, 288,1-21,,Y,YG,2002,,,"plan 3, subtract IH 2.63 from FS, or 5 m from RLs",drawing,"TBM 1.29, BS 1.34, IH= 2.63", 38,,,Y,YG,2002,,,"plan 5. subtract IH 2.8 from FS, or 5 m from RLs",drawing,"TBM ""6.11""=+1.11 (Vicus 0.00 datum was revalued by RC at 5.00), BS 1.69, IH=2.8", 39,,,Y,YG,2002,,,"plan 6, subtract IH 2.76 from levels",drawing,"TBM ""6.11""=+1.11 (Vicus 0.00 datum was revalued by RC at 5.00) BS 1.65, IH 2.76", 40,,,Y,YG,2002,11,,plan 7. subtract 5.00 m from reduced levels,drawing,"TBM ""6.11""=+1.11 (Vicus 0.00 datum was revalued by RC at 5.00 m)", 41,,,Y,YG,2002,8,,Plan. subtract IH 1.45 from levels,drawing,"TBM 0.00, BS 1.45, IH=1.45", 43,,,Y,YG,2002,,,Plan. RL levels wrong. Subtract IH 2.65 from FS levels,drawing,"TBM ""6.11""= 1.11, BS 1.54, IH=2.65 ", 43,SF,,Y,YG,2002,,,Small Finds levels (Bottom right of drawing) subtract IH 2.56,drawing,"TBM 1.11, BS 1.45, IH= 2.56 ", 295,datum,0.87,Y,YG,2002,,,section drawing datum line ,drawing,"TBM 1.11, BS 1.54, IH 2.65 ", 70,datum,0.45,Y,YG,2003,,,section/elevation drawing datum line,drawing,"TBM 1.11, BS 1.3, IH= 2.41", 44,,,Y,YG,2003,,,Plan 12. Subtract IH 2.78 from FS (or 5 m from RL),drawing,"TBM 1.11, BS 1.67, IH+ 2.78", 45,,,Y,YG,2003,,,plan 13. Subtract IH 2.62 from FS (or 5 m from RL),drawing,"TBM 1.11, BS 1.51, IH=2.62", 46,,,Y,YG,2003,,,plan 14. Subtract IH 2.24 from FS (or 5 m from RL) ,drawing,"TBM 1.11, BS 1.13, IH= 2.24", 47,,,Y,YG,2003,,,plan 15 subtract 2.41 from FS (or 5.00 from RL),drawing,"TBM 1.11, BS 1.30, IH= 2.41", 48,,,Y,YG,2003,,,plan 16. Subtract IH 2.41 from FS (or 5 m from RL),drawing,"TBM 1.11, BS 1.30, IH= 2.41", 49,,,Y,YG,2003,,,plan 17. Subtract IH 2.65 from FS (Or 5 m from RL),drawing,"TBM 1.11 + BS 1.54, IH+ 2.65", 50,,,Y,YG,2003,,,Plan 18. Subtract IH 2.29 from FS,drawing,"TBM 1.11, BS 1.18, IH =2.29", 51,,,Y,YG,2003,28,,plan 19 subtract IH 2.32 from FS,drawing,"TBM 1.11, BS 1.21. IH=2.32", 52,,,Y,YG,2003,32,,plan 20. subtract IH 2.37 from FS levels,drawing,"TBM 1.11, BS 1.26, IH = 2.37", 53,,,Y,YG,2003,34,,plan 24 subtract IH 2.06 from FS,drawing,"TBM ""6.11""=1.11, BS 0.95, IH= 2.06", 306,,,Y,YG,2003,29-30-31,,plan 23. Subtract IH 2.06 m from FS,drawing,"TBM ""6.11""=1.11, BS 0.95, IH= 2.06", 54,,,Y,YG,2004,,,plan 30. Subtract IH 2.48 from levels,drawing,"TBM YG=1.18, BS 1.30, IH = 2.48", 55,,,Y,YG,2004,,,plan 33. Subtract IH 2.38 from levels,drawing,", BS 1.20, IH= 2.38", 57,,,Y,YG,2004,,,plan 33A. Subtract IH 2.52 from levels,drawing,"TBM YG=1.18, BS 1.34, IH= 2.52", 58,,,Y,YG,2004,,,plan 38. Subtract IH 2.45,drawing,"TBM YG=1.18, BS 1.27, IH= 2.45", 59,,,Y,YG,2004,,,plan 34. Subtract IH 2.28,drawing,"TBM YG=1.18, BS 1.10, IH= 2.28", 60,,,Y,YG,2004,,,plan 35. Subtract IH 2.47,drawing,"TBM YG=1.18, BS 1.29, IH = 2.47", 61,,,Y,YG,2004,,,plan 37. Subtract IH 2.22,drawing,"TBM YG=1.18, BS 1.04, IH= 2.22", 62,,,Y,YG,2004,,,Plan 32. Subtract IH 2.40,drawing,"TBM YG=1.18, BS 1.218, IH=2.4", 63,,,Y,YG,2004,,,plan 39 no levels,drawing,, 64,,,Y,YG,2004,72-73,,plan 36. Subtract IH 2.37,drawing,"TBM YG=1.18, BS 1.19, IH=2.37", 65,,,Y,YG,2004,"78,79,81",,plan 47. Subtract IH 2.45,drawing,"TBM YG=1.18, BS 1.27, IH 2.45", 305,1-14,,Y,YG,2004,,,plan 36. subtract IH 2.44,drawing,"TBM YG=1.18, BS 1.26, IH= 2.44", 305,15,,Y,YG,2004,,,plan 36. Subtract IH 2.38,drawing,"TBM YG=1.18, BS 1.20, IH= 2.38", 71,1-6,,Y,YG,2004,,,section/elevation Subtract IH 2.41 from levels,drawing,"TBM YG=1.18, BS 1.23, IH 2.41", 72,datum,,Y,YG,2004,,,section drawing datum line. No levels =? [74],drawing,, 73,1,0.07,Y,YG,2004,,,section drawing datum line (north end),drawing,"TBM YG=1.18, BS 1.27, IH= 2.45", 73,2,0.04,Y,YG,2004,,,section drawing datum line (south end),drawing,"TBM YG=1.18, BS 1.27, IH= 2.45", 74,datum,,Y,YG,2004,,,section drawing datum line,drawing,"TBM YG=1.18, BS 1.23, IH = 2.41", 75,1,0.22,Y,YG,2004,,,section drawing datum line (north end),drawing,"TBM YG=1.18, BS 1.23, IH = 2.41", 75,2,0.28,Y,YG,2004,,,section drawing datum line (south end),drawing,"TBM YG=1.18, BS 1.23, IH = 2.41", 76,datum,-0.17,Y,YG,2004,,,section drawing datum line,drawing,"TBM YG=1.18, BS 1.27, IH=2.45", 77,1,-0.22,Y,YG,2004,,,section drawing datum line,drawing,"TBM YG=1.18, BS 1.27, IH=2.45", 77,2,-0.19,Y,YG,2004,,,section drawing datum line,drawing,"TBM YG=1.18, BS 1.27, IH= 2.45", 78,datum,-0.11,Y,YG,2004,,,section drawing datum line,drawing,"TBM YG=1.18, BS 1.27, IH= 2.45", 79,datum,1.18,Y,YG,2004,,,section drawing datum line,drawing,"TBM YG=1.18, BS 1.27, IH =2.45", 80,datum,2.47,Y,YG,2004,,,section drawing datum line,drawing,"TBM YG=1.18, BS 1.29, IH=2.47", 81,datum,2.47,Y,YG,2004,,,section drawing datum line,drawing,"TBM YG=1.18, BS 1.29, IH=2.47", 86,1,0.78,Y,YG,2004,,,section drawing datum line,drawing,"TBM YG=1.18, BS 1.27, IH=2.45", 86,2,0.77,Y,YG,2004,,,section drawing datum line,drawing,"TBM YG=1.18, BS 1.27, IH=2.45", 66,,,Y,YG,2005,,,plan 53. Subtract IH 2.23 from levels,drawing,"TBM YG= 1.18, BS 1.048, IH=2.23", 67,,,Y,YG,2005,,,plan 54. Subtract IH 2.13,drawing,"TBM YG= 1.18. BS 0.95, IH= 2.13", 68,,,Y,YG,2005,,,plan 55. Subtract IH 2.12,drawing,"TBM YG= 1.18, BS 0.94, IH=2.12", 68a,,,Y,YG,2005,,,plan 56. Subtract IH 2.455,drawing,"TBM YG= 1.18. BS 1.275, IH= 2.455", 68b,,,Y,YG,2005,,,plan 57. Subtract IH 2.473,drawing,"TBM YG= 1.18, BS 1.293, IH=2.473", 82,2.397,-0.177,Y,YG,2005,,,section 54. ,drawing,"TBM YG= 1.18, BS 1.04, IH=2.22", 82,2.435,-0.215,Y,YG,2005,,,section 54. ,drawing,"TBM YG= 1.18, BS 1.04, IH=2.22", 13,1-17,,Y ,YGE,2006,"2, 6,7",,plan 1. Subtract IH 2.71,drawing,"TBM YG =1.18, BS 1.53, IH= 2.71", 14,1-18,,Y ,YGE,2006,"9, 10",,plan 2. Subtract IH 2.36,drawing,"TBM YG=1.18, BS1.18, IH = 2.36", 15,1-11,,Y ,YGE,2006,"11, 12",,plan 3. Subtract IH 2.36,drawing,"TBM YG=1.18, BS1.18, IH = 2.36", 16,1,0.28,Y ,YGE,2006,12,,plan 4. Subtract IH 2.36,drawing,"TBM YG=1.18, BS1.18, IH = 2.36", 18,1-29,,Y,YH,2005,1,,plan1. Subtract IH 2.205,drawing,"TBM YG=1.18, BS 1.025, IH= 2.205", 19,1.21,,Y,YH,2005,"2,3",,plan 2. Subtract IH 2.175,drawing,"TBM YG=1.18, BS 0.995, IH =2.175", 20,1-23,,Y,YH,2005,"2,3,5",,plan 3. Subtract IH 2.372,drawing,"TBM YG=1.18, BS 1.192, IH= 2.372", 21,1-24,,Y,YH,2005,6,,plan 4. Subtract IH 2.228,drawing,"TBM YG=1.18, BS 1.048, IH=2.228", 22,1-21,,Y,YH,2005,3,,plan 5. Subtract IH 2.222,drawing,"TBM YG=1.18, BS 1.042, IH= 2.222", 23,1-27,,Y,YH,2005,"9,10",,plan 6. Subtract IH 2.359,drawing,"TBM YG=1.18, BS 1.179, IH= 2.359", 23,1-9,,Y,YH,2005,9,,profile of cut 9. Subtract IH 2.275,drawing,"TBM YG=1.18, BS 1.095, IH= 2.275", 24,1-24,,Y,YH,2005,11,,plan 7. Subtract IH 2.355,drawing,"TBM YG=1.18, BS 1.175, IH= 2.355", 25,1-16,,Y,YH,2005,"12,13",,plan 8. Subtract IH 2.215,drawing,"TBM YG=1.18 BS 1.035, IH= 2.215", 27,1-17,,Y,YH,2005,14-17,,plan 11. Subtract IH 2.88,drawing,"TBM YG=1.18, BS 1.7, IH= 2.88", 28,1-16,,Y,YH,2006,14-20,,Plan 12. Subtract IH 2.36,drawing,"TBM YG=1.18, BS 1.18, IH= 2.36", 29,1-32,,Y,YH,2006,16-20,,plan 13. Subtract IH 2.39,drawing,"TBM YG=1.18, BS 1.21, IH= 2.39", 30,1-29,,Y,YH,2006,21-23,,plan 14. subtract IH 2.42,drawing,"TBM YG=1.18, BS 1.24, IH= 2.42", 31,1-26,,Y,YH,2006,24,,plan 15. Subtract IH 2.36,drawing,"TBM YG=1.18, BS 1.18, IH= 2.36", 32,1-14,,Y,YH,2006,25-28,,plan 16. Subtract IH 2.56,drawing,"TBM YG=1.18, BS 1.38, IH=2.56", 33,Jan-16,,Y,YH,2006,29,,plan 17. Subtract IH 2.625,drawing,"TBM YG=1.18,BS 1.445, IH=2.625", ,,,,,,,,,,, 26,datum,1.04,Y,YH,2006,,,section drawing datum line,drawing,"TBM YG=1.18, BS 1.7, IH=2,249", 34,datum,1.42,Y,YH,2006,7,,elevation wall 7 drawing datum line,drawing,"TBM YG=1.18, BS 1.70, IH=2.88", 236,datum,1.12,,,,,,,,, 485,datum,1.12,,,,,,,,,