Drawing Number,Scale,Description,Drawn By,Date,Drawing Type 1,20,"South-facing section through 101-108","JKH","2002-06-17 00:00:00","S" 2,20,"W. end of timber drain 111","JB","2002-06-27 00:00:00","P" 3,20,"Profile through drain 111 W end","JKH","2002-06-27 00:00:00","PR" 4,20,"E. end of timber drain 111","JB","2002-06-27 00:00:00","P" 5,20,"Profile through E. end drain 111","JB","2002-06-27 00:00:00","PR" 6,20,"Plan of curved timbers to E of site 113","JB","2002-06-27 00:00:00","P" 7,20,"Plan of W. end timber drawn 111 PX","JB","2002-06-28 00:00:00","P" 8,20,"Plan of E. end timber drain 111 PX","JB","2002-06-28 00:00:00","P" 9,20,"Plan of sample 101 and dendro sample Boat 120","JB","2002-06-29 00:00:00","P" 10,20,"Plan of unworked timber from N/W 1044","JB","2002-07-01 00:00:00","P" 11,20,"Section of unworked timber from N/W 1044","JB","2002-07-01 00:00:00","S" 12,20,"Plan of paved area 112 - slipway","JB","2002-07-02 00:00:00","P" 13,20,"Profile of paved area 112 - slipway","JB","2002-07-02 00:00:00","S" 14,10,"Section SE corner of site 125","JMB","2002-07-03 00:00:00","S" 15,20,"Plan timbers (Slipway?) (PC104/2 P1011) 113","JMB","2002-07-03 00:00:00","P" 16,10,"Section through deposits S. of slipway","JMB","2002-07-07 00:00:00","S" 17,5,"Plan of windlass 1059","JB","2002-07-04 00:00:00","P" 18,5,"Elevation of left end windlass 1059","JB","2002-07-04 00:00:00","E" 19,20,"Articuater timbers 134","JB","2002-07-09 00:00:00","P" 20,5,"Front elevation of windlass 1059","JB","2002-07-10 00:00:00","E" 21,20,"Plan of st knee + composite crossbean 135","JB","2002-07-10 00:00:00","P" 22,10,"Sketch plan of timber (Adjacent to 135) 136","JB","2002-07-11 00:00:00","P" 23,10,"Section to N. through. Palaeochannel","JB","2002-07-11 00:00:00","S" 24,0,"Sketch plan timbers S.E of boat (Stern area?)","JMB","2002-07-15 00:00:00","P" 25,0,"Sketch plan wicker N.W of boat (Bow?)","JMB","2002-07-13 00:00:00","P" 26,0,"Sketch plan ?sternpost rudder NW of site","JB","2002-07-14 00:00:00","P" 27,0,"Sketch plan of timbers in NE corner","JKH","2002-07-17 00:00:00","P" 28,0,"Sketch plan of coin in bow to NW corner","JB","2002-07-17 00:00:00","P" 29,5,"Plan of 1061","JB","2002-07-23 00:00:00","P" 30,5,"Elevation of 1061 (E)","JB","2002-07-23 00:00:00","P" 31,5,"Elevation of 1061 (N)","JB","2002-07-23 00:00:00","P" 32,5,"Detailed timber drawing 1075","NN","2002-07-24 00:00:00","PE" 33,,"VOID",,, 34,0,"Copy of concrete pile plan","SPR","2002-07-24 00:00:00","P" 35,5,"Elevation of 1061- 1063","JB","2002-07-24 00:00:00","E" 36,5,"End elevation of 1061- 1063","SJM","2002-07-25 00:00:00","E" 37,5,"Plans elevation timber no. 1105","SJM","2002-07-25 00:00:00","PE" 38,5,"Plans elevation timber no. 1106","SJM","2002-07-26 00:00:00","PE" 39,,"VOID",,, 40,10,"Plan of displaced timbers cF10-30","JB","2002-07-26 00:00:00","P" 41,5,"Possible breasthook/bulwork 1104","FJB","2002-07-26 00:00:00","PE" 42,10,"Plan of decking N of F44 STBO","HPM","2002-07-27 00:00:00","P" 43,10,"Plan of bow of ship 120","JB/FJB","2002-07-29 00:00:00","P" 44,10,"Plan of decking 144 reed matting 146","AS/RJB","2002-07-29 00:00:00","P" 45,20,"Model of profile through 120 2 midships","AS","2002-07-25 00:00:00","S" 46,10,"Section : baulk amidships (F30 STBD) 128 STBD","JB","2002-07-31 00:00:00","S" 47,10,"Section: baulk amidships centre (F30 STBD) 180 C","AS","2002-07-31 00:00:00","S" 48,10,"Section: baulk amidships (F32P) P","RCH","2002-07-31 00:00:00","S" 49,10,"Plan of F10-20 timbers in file","JB","2002-08-02 00:00:00","P" 50,10,"Plan of F20-30 timbers in file","RCH","2002-08-02 00:00:00","P" 51,10,"Plan of F30 stern timbers in file","JB","2002-08-03 00:00:00","P" 52,10,"Pr of frame 18","SJM","2002-08-04 00:00:00","PR" 53,10,"Pr of frame 14","HPM","2002-08-05 00:00:00","PR" 54,10,"Plan of timber 1247","SJR/RCH","2002-08-06 00:00:00","P" 55,10,"Pr of frame 22","HPM","2002-08-06 00:00:00","PR" 56,10,"Profile of frame 6","SPR","2002-08-08 00:00:00","PR" 57,10,"Sketch plan F 305-405 Decking 150","RCH","2002-08-08 00:00:00","P" 58,10,"Profile of frame 9","JB/SIM","2002-08-09 00:00:00","PR" 59,10,"Plan of portside from F10 to F24","JMB","2002-08-09 00:00:00","P" 60,10,"Profile of frame 4","JB/SIM","2002-08-10 00:00:00","PR" 61,10,"Profile of frame 2","JB/SIM","2002-08-10 00:00:00","PR" 62,10,"Profile of frame 1","JB/SIM","2002-08-10 00:00:00","PR" 63,10,"Overlay for plan of bow","JAS/RCH","2002-08-11 00:00:00","P" 64,10,"Plan of port side frames 25","JAS/RCH","2002-08-14 00:00:00","P" 65,10,"(Quick)Plan of small loose timbers on ceiling to south","JB","2002-08-14 00:00:00","P" 66,10,"overlay of plan 64 - showing levels","JAS/RCH","2002-08-14 00:00:00","P" 67,10,"Central area western end ceiling planks","JB/SJM","2002-08-16 00:00:00","P" 68,10,"Plan ceiling planks & frames F21-","JAS/RCH","2002-08-14 00:00:00","P" 69,10,"Plan of large timbers near stern starboard","NN","2002-08-17 00:00:00","P" 70,10,"Add on for DWG 68. Starboard side","JAS/RCH","2002-08-16 00:00:00","P" 71,10,"Plan of mast step + port side","SPR","2002-08-17 00:00:00","P" 72,10,"Plan of ceiling planks STBD of mast step","HPM/TC","2002-08-17 00:00:00","P" 73,10,"Overlay for levels DWG 59","JMB","2002-08-18 00:00:00","P" 74,10,"Plan of ceiling planks (Stern)","RCH/JAS","2002-08-20 00:00:00","P" 75,10,"Profile of frame 29","JB/HPM","2002-08-20 00:00:00","PR" 76,10,"Overlay for levels DWG 71","SPR","2002-08-21 00:00:00","P" 77,10,"Overlay for levels DWG 72","SPR/FJB","2002-08-21 00:00:00","P" 78,10,"Plan of ceiling boards, port, cF40-45","HPM/JMB","2002-08-20 00:00:00","P" 79,10,"Profile of frame 45","AP","2002-08-22 00:00:00","PR" 80,10,"Plan of mast step","AP","2002-08-25 00:00:00","P" 81,10,"Overlay plan of brace and large oak blocks (one with stantion mortise)","JAS/RCM","2002-08-26 00:00:00","P" 82,10,"Overlay DWG 70 (Levels)","JMB","2002-08-26 00:00:00","P" 83,,"VOID",,, 84,10,"Plan of ceiling planks, port F24-27 no ceiling pla","AP/RCH","2002-08-26 00:00:00","P" 85,10,"Overlay (DWG 80 levels)","AP","2002-08-27 00:00:00","P" 86,10,"Plan of ceiling planks, STBO F 26-33","AP","2002-08-27 00:00:00","P" 87,10,"Profile of frames 25","HPM/JAS","2002-09-05 00:00:00","PR" 88,10,"Profile of frame 33","RCH/RJB","2002-09-05 00:00:00","PR" 89,10,"Profile of frame 37","MPM/JAS","2002-09-06 00:00:00","PR" 90,10,"Plan of STBD bow stringers/frames F10-22","JAS/RCH","2002-09-08 00:00:00","P" 91,10,"Plan of STBD stringers /frames cF30-42","SSR/SP/HPM","2002-09-08 00:00:00","P" 92,10,"Overlay for levels of plan 70","JAS/RCH","2002-09-09 00:00:00","P" 93,10,"Tracing of mast step area for lifting","MPL","2002-09-13 00:00:00","P" 94,10,"Plan of top of frames F40-F53","SP/CG","2002-09-15 00:00:00","P" 95,20,"(Composite) Plan of frames 1-11","JB","2002-09-17 00:00:00","P" 96,10,"Profile of frame 53","HPM/BP","2002-09-17 00:00:00","PR" 97,10,"Profile of frame 57","JAS/RCM","2002-09-17 00:00:00","PR" 98,10,"Mast step area F28 after removal(?) of ??? And braces","PH","2002-09-18 00:00:00","P" 99,10,"Plan of trench 6: showing timbers 204-207 (inc) in 2027","RD","2002-09-18 00:00:00","P" 100,10,"Profile of frame 49","HPM/CAG","2002-09-18 00:00:00","PR" 101,10,"Profile of frame 41","HPM/JAS","2002-09-19 00:00:00","PR" 102,10,"Plan of futtocks F30 -33 STBD","HPM/24","2002-09-22 00:00:00","P" 103,10,"Overlay of Plan 091/074 showing timbers 1816","PWH","2002-09-22 00:00:00","P" 104,10,"Frame lifting diagram","?","2002-09-23 00:00:00","P" 105,10,"Frames 27-30 starboard","MPL","2002-09-23 00:00:00","P" 106,10,"Plan of frames 27-29 [20-22E, 100-101N]","HPM","2002-09-23 00:00:00","P" 107,10,"Plan of frames 12-25 (was 95/2)",,,"P" 108,10,"Plan of frames 26-40P to 101N (was 95/3)","OV","2002-09-18 00:00:00","P" 109,10,"Plan of frames 41-54 (Was95/4)","MPL","2002-09-18 00:00:00","P" 110,10,"Plan of frames 23-40 beneath keelson","CAG","2002-09-27 00:00:00","P" 111,10,"Plan of frames 41- beneath keelson","CAG","2002-09-28 00:00:00","P" 112,10,"Section of deposits behind (S) F8","RD","2002-09-30 00:00:00","S" 113,10,"Section of deposits behind (S) F56","ND","2002-10-01 00:00:00","S" 114,10,"Overlay of levels for plan 043","JB","2002-07-30 00:00:00","P" 115,10,"Sketch plan of timber 1909","ND","2002-10-01 00:00:00","P" 116,10,"Overlay of pump hole in F7 + 8 (To DWG. 095)","DV","2002-10-06 00:00:00","P" 117,10,"Plan of frames F50-61","JS/CG/MT","2002-10-09 00:00:00","P" 118,10,"Sketch of FS8-61- loose timber frags","RCH","2002-10-07 00:00:00","P" 119,10,"Overlay to DWG 095 showing F10.1-10.2","JAS","2002-10-17 00:00:00","P" 120,10,"Profile of frame 59","RCH","2002-10-17 00:00:00","PR" 121,10,"Profile of frame 62- fore face","RCH","2002-10-17 00:00:00","PR" 122,10,"Overlay for DWG 117 shows plank below","MT","2002-10-25 00:00:00","P" 123,10,"Fore face profile frame 61","MT","2002-10-28 00:00:00","PR" 124,10,"Overlay for rope under starboard strakes at the stern","MT","2002-11-06 00:00:00","P" 125,10,"Sketch plan of bow ropes, port side (small finds numbers 176,177,178,184)","RD","2002-11-07 00:00:00","P" 126,10,"Sketch of timber slab 2543 at stern","HPM","2002-11-09 00:00:00", 127,20,"Position of two timbers below ship on portside 2543 and 2545","MT","2002-11-11 00:00:00","P" 128,0,"Schematic diagram of hull planking",,,"P" 200,100,"Plot derived from Total Station survey of cofferdam/wood and finds in 2027","AY","2002-11-14 00:00:00","P" 201,10,"Detailed drawings of timbers 204,220 and 222","NN","2002-11-14 00:00:00","PE" 300,10,"Loose timbers under starboard side of ship with slag + stone deposit","MT","2002-11-14 00:00:00","P" 301,10,"Structure 1003,slag + debris spread + poss structural timbers cradle","MT","2002-11-18 00:00:00","P" 302,10,"Overlay for DWG No 300- extra timbers","MT","2002-11-22 00:00:00","P" 303,10,"Deposits w of 1003 showing context 1006","HPM","2002-11-26 00:00:00","P" 304,10,"Overlay for DWG 300 + 302 shows feature 1005 and context 1007","MT","2002-11-27 00:00:00","P" 305,10,"Shows context differences 1007,1013,1002","MT","2002-11-28 00:00:00","P" 306,10,"Shows 1000/1015/1006/1016/1009/1008/1011 and 1010","RLL","2002-11-28 00:00:00","S" 307,10,"Plan of 1017 and 1018","RLL","2002-11-03 00:00:00","P" 308,10,"Overlay for 300 context 1013,1019,1018,1023,1024,1025","MT","2002-12-03 00:00:00","P" 309,10,"Section of 1002/1006/1010/1017/1018 and cut 1026",,"2002-12-03 00:00:00","S" 310,10,"Plan of 560,568,569","RD","2002-12-09 00:00:00","P" 311,10,"Plan of 517 and S ends of 546","MT","2002-12-09 00:00:00","P" 312,10,"Section of east face through 1000, 1001, 1014 east of 1003","HPM","2002-12-09 00:00:00","S" 313,10,"Section of 1000/1002/1006/1016/1009 + 1010","RLL","2002-12-09 00:00:00","S" 314,10,"Plan of 1004","MT","2002-12-09 00:00:00","P" 315,10,"Timber 559","MT","2002-12-12 00:00:00","P" 316,10,"Section of excavated walkway (S facing section) East of DWG 306 1003","RLL","2002-12-16 00:00:00","S" 317,5,"Plan of skeleton 1029","HPM","2002-12-17 00:00:00","P" 318,10,"Walkway structure 1003 (Fully exposed)","MT","2002-12-18 00:00:00","P" 319,10,"Plan of 577,578,579","RD","2002-02-18 00:00:00","S" 320,10,"Section north of walkway","MT/HPM","2002-12-19 00:00:00","S"