Context ,Description/Type,Trench,Area,Plan,Section,Name ,Date 1,Modern Made Ground,Verizon Utility,,1,,RH,17/12/11 2,Re-deposited soil,Trench A,,,2,RH,13/5/12 3,Brick Wall,Trench A,,3,,RH,13/5/12 4,Fill ,Trench 1,,4,3,RH,22/6/12 5,Fill ,Trench 1,,,3,RH,22/6/12 6,Brick Floor,Trench 1,,,3,RH,22/6/12 7,Dump deposit,Trench 2,,,4,RE,30/6/12 8,Backfill of Utility Trench,Trench 2,,,"4, 5",RE,30/6/12 9,Dump layer,Trench 2,,9,"4, 5",RE,30/6/12 10,Dump deposit,Trench 2,,,"4, 5",RE,30/6/12 11,Gas Main installation cut,Trench 2,,,5,RE,30/6/12 12,Post-medieval wall,Trench 2,,9,"4, 5",RE,30/6/12 13,City Wall,+,,13,,SP,17/9/13