File name,Title,Abstract ,Author/editor (each individual should be added on a new row),,,,Page Count,Date Published,Publisher,Place Published ,Volume/ Issue/Report Number,ISBN,DOI,URL,Language,Software,Software Version ,,,Type,First Name,Last Name,Organisation,,,,,,,,,,, ,,,,,,,,,,,,,,,,, 1S17CPSTT_interim report.pdf,"Interim Report for trial trenching at 18 inch pipe ? spur, 450NB Pipeline Diversion (007) Fulmer to Haste Hill","This interim report presents the prelimianary results of the archaeological evaluation at the Fulmer to Haste Hill 450NB HP Pipeline Diversion",Author,Jessica ,Bryan,MOLA HEADLAND INFRASTRUCTURE,23,16/08/2019,MOLA HEADLAND INFRASTRUCTURE,LONDON,2,,,,ENGLISH,ACROBAT READER,9.5 1S17CPSTT_hs2s_digital_archive_selection_strategy.pdf,HS2S Digital Archive Selection Strategy: Fulmer to Haste Hill 18 inch pipe spur 450NB Pipeline Diversion,"This document sets out the digital data selection strategy relating to this work, providing details of the methods used for the selection and preparation of digital data for archive with the ADS for the trial trenching for the Fulmer to Haste Hill 450NB HP Pipeline Diversion",Author,Nikiforos,Tounousidis,MOLA HEADLAND INFRASTRUCTURE,14,23/11/2021,MOLA HEADLAND INFRASTRUCTURE,LONDON,1,,,,ENGLISH,ACROBAT READER,9.5 1S17CPSTT_lithic_assessment.docx, Pipeline Diversion (007) Fulmer to Haste Hill (1S17CPSTT): Lithic assessment,"This assessment details the worked flint assemblages recovered from the trial trenches and provides a review of the typology, dating and significance of the assemblages. ",Author,Jon,Cotton,MOLA HEADLAND INFRASTRUCTURE,5,04/05/2018,MOLA HEADLNAD INFRASTRUCTURE,LONDON,1,,,,ENGLISH,WORD,OFFICE 365 1S17CPSTT_location_specific_written_scheme_of_investigation.pdf,LS-WSI for Trial Trenching and archaeological recording for the Fulmer to Haste Hill 450NB HP Pipeline Diversion . ,This LS-WSI outlines the delivery of the programme for archaeological trial trenching at utility diversion works in the Colne Valley as part of the diversion of two gas mains; 48? main diversion and an 18? spur which will be carried out as part of non-contestable utilities works in advance of HS2 main works.,Author,Marit ,Leenstra,MOLA HEADLAND INFRASTRUCTURE,29,20/12/2017,MOLA HEADLAND INFRASTRUCTURE,LONDON,2,,,,ENGLISH,ACROBAT READER,9.5 1S17CPSTT_project_plan.pdf,"Project Plan for Trial Trenching of 18 inch pipespur, 450NB Pipeline Diversion (007) Fulmer to Haste Hill","This Project Plan details proposed methodologies, techniques and deliverables for archaeological trial trenching at the Fulmer to Haste Hill 450NB HP Pipeline Diversion (007).",Author,Marit ,Leenstra,MOLA HEADLAND INFRASTRUCTURE,32,20/12/2017,MOLA HEADLAND INFRASTRUCTURE,LONDON,3,,,,ENGLISH,ACROBAT READER,9.5 1S17CPSTT_scanned_context_sheets.pdf,Scanned Context Sheets,Scanned versions of the context sheets completed on site by the archaeological team,Creator,Nikiforos,Tounousidis,MOLA HEADLAND INFRASTRUCTURE,76,27/10/2021,MOLA HEADLAND INFRASTRUCTURE,LONDON,1,,,,ENGLISH,ACROBAT READER,9.5 1S17CPSTT_scanned_sample_register_sheets.pdf,Scanned Sample Register Sheets,Scanned versions of the enviromental sample register used by the archaeological team on site,Creator,Nikiforos,Tounousidis,MOLA HEADLAND INFRASTRUCTURE,2,27/10/2021,MOLA HEADLAND INFRASTRUCTURE,LONDON,1,,,,ENGLISH,ACROBAT READER,9.5 1S17CPSTT_scanned_section_register.pdf,Scanned Section Register,Scanned version of the section register listing the sections drawn for the site,Creator,Nikiforos,Tounousidis,MOLA HEADLAND INFRASTRUCTURE,1,03/03/2022,MOLA HEADLAND INFRASTRUCTURE,LONDON,1,,,,ENGLISH,ACROBAT READER,9.5 1S17CPSTT_scanned_section_drawings.pdf,Scanned Section Drawings,Scanned version of the section drawings,Creator,Nikiforos,Tounousidis,MOLA HEADLAND INFRASTRUCTURE,5,03/03/2022,MOLA HEADLAND INFRASTRUCTURE,LONDON,1,,,,ENGLISH,ACROBAT READER,9.5 1S17CPSTT_scanned_digital_image_register.pdf,Scanned Digital Image Register,Scanned version of the Digital Image Register completed on site,Creator,Nikiforos,Tounousidis,MOLA HEADLAND INFRASTRUCTURE,5,03/03/2022,MOLA HEADLAND INFRASTRUCTURE,LONDON,1,,,,ENGLISH,ACROBAT READER,9.5