File name,Title,Abstract ,Author/editor (each individual should be added on a new row),,,,Page Count,Date Published,Publisher,Place Published ,Volume/ Issue/Report Number,ISBN,DOI,URL,Language,Software,Software Version ,,,Type,First Name,Last Name,Organisation,,,,,,,,,,, ,,,,,,,,,,,,,,,,, 1C18CVDTT_ Phases_2_and_3_med_pottery_specialist_report.pdf,"HS2 Central, Dew's Farm (1C18CVDTT), Phases 2 and 3. Note on the medieval pottery, October 2020",Medieval pottery specialist report (Phases 2-3) for trial trench evaluation works at Dews Farm,AUTHOR,Nigel ,Jeffries,MOLA HEADLAND INFRASTRUCTURE,1,01/10/2020,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_All_phase_cons_note.pdf,"HS2 Central, Dew's Farm (1C18CVDTT), all phases. Conservation note, October 2020",Conservation note (all phases) for trial trench evaluation works at Dews Farm ,AUTHOR,Lucie,Altenburg,MOLA HEADLAND INFRASTRUCTURE,1,01/10/2020,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_All_phases_BM_report.pdf,"HS2 Central, Dew's Farm (1C18CVDTT), all phases. Bulding material assessment, November 2020",Bulding material assessment (all phases) for trial trench evaluation works at Dews Farm ,AUTHOR,Ian M. ,Betts,MOLA HEADLAND INFRASTRUCTURE,3,01/11/2020,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_All_Phases_Glass_and_Pipe_specialist_report.pdf,"HS2 Central, Dew's Farm (1C18CVDTT), all phases. Glass and Clay Tobacco Pipe, November 2020",Glass and clay tobacco pipe report (all phases) for trial trench evaluation works at Dews Farm ,AUTHOR,Nigel ,Jeffries,MOLA HEADLAND INFRASTRUCTURE,3,01/11/2020,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_All_Phases_Prehist_PR_pottery_report.pdf,"HS2 Central, Dew's Farm (1C18CVDTT), all phases. Prehistory (Neolithic to early Iron Age) and post-Roman pottery report, October 2020",Prehistory (Neolithic to early Iron Age) and post-Roman pottery report (all phases) for trial trench evaluation works at Dews Farm ,AUTHOR,Lyn,Blackmore,MOLA HEADLAND INFRASTRUCTURE,10,01/10/2020,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_Context_record_sheets.pdf,Context record sheets for 1C18CVDTT,Scanned copy of the originals context record sheets ,CREATOR,Marit ,Leenstra,MOLA HEADLAND INFRASTRUCTURE,82,12/10/2021,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_Context_register.pdf,Context Register for 1C18CVDTT,Scanned copy of the original context register,CREATOR,Marit ,Leenstra,MOLA HEADLAND INFRASTRUCTURE,2,12/10/2021,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_Context_sheets.pdf,Context sheets,Scanned copy of the original context sheets,CREATOR,Mike,Curnow ,MOLA HEADLAND INFRASTRUCTURE,8,14/03/2021,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_Drawing_register.pdf,Drawing Register for 1C18CVDTT,Scanned copy of the original drawing register,CREATOR,Marit ,Leenstra,MOLA HEADLAND INFRASTRUCTURE,1,12/10/2021,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_drawings_register.pdf,Drawings register for 1C18CVDTT,Scanned copy of the original drawings register,CREATOR,Marit ,Leenstra,MOLA HEADLAND INFRASTRUCTURE,18,13/09/2021,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_Finds_registers.pdf,Finds Register for 1C18CVDTT,Scanned copy of the original finds register,CREATOR,Marit ,Leenstra,MOLA HEADLAND INFRASTRUCTURE,38,12/10/2021,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_HOAC_and_Hillingdon_Context_List.odt,HOAC and Hillingdon Context List,Index of context records recorded at Dews Farm,CREATOR,Mike,Curnow ,MOLA HEADLAND INFRASTRUCTURE,43,22/10/2021,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_Masonry_sheet.pdf,Masonry sheet,Scanned copy of an original masonry sheet,CREATOR,Mike,Curnow ,MOLA HEADLAND INFRASTRUCTURE,1,14/03/2021,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_paper_archive_inventory.odt,Paper archive inventory for 1C18CVDTT,Paper archive inventory ,CREATOR,Marit ,Leenstra,MOLA HEADLAND INFRASTRUCTURE,1,12/10/2021,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_Phase_1_Drawing_registers.pdf,Drawing registers (Phase 1) for 1C18CVDTT,Scanned copy of the original drawings registers (Phase 1) ,CREATOR,Marit ,Leenstra,MOLA HEADLAND INFRASTRUCTURE,6,12/10/2021,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_Phase_1_flint_specialist_report.pdf,"HS2 Central, Dew's Farm (1C18CVDTT), phase 1. Lithics report (Phase 1)",Lithics report (Phase 1) for trial trench evaluation works at Dews Farm ,AUTHOR,Yvonne ,Wolframm-Murray,MOLA HEADLAND INFRASTRUCTURE,6,01/10/2020,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_phase_1_flint_specialist_table.pdf,"HS2 Central, Dew's Farm (1C18CVDTT), Phase 1. Lithics report tables (Phase 1)",Lithics report tables (Phase 1) for trial trench evaluation works at Dews Farm ,AUTHOR,Yvonne ,Wolframm-Murray,MOLA HEADLAND INFRASTRUCTURE,5,01/10/2020,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_phase_1_LIA-Rom_pottery_specialist_report.pdf,"HS2 Central, Dew's Farm (1C18CVDTT), Phase 1. Late Iron Age and Roman pottery report, November 2020",Late Iron Age and Roman pottery report (Phase 1) for trial trench evaluation works at Dews Farm ,AUTHOR,Charlotte,Burn,MOLA HEADLAND INFRASTRUCTURE,2,01/10/2020,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_Phase_1_Photos_registers.pdf,Photos register (Phase 1) for 1C18CVDTT,Scanned copy of the original photos register (Phase 1) ,CREATOR,Marit ,Leenstra,MOLA HEADLAND INFRASTRUCTURE,25,12/10/2021,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_Phase_1_Prehist_post-Rom_pottery_specialist_report.pdf,"HS2 Central, Dew's Farm (1C18CVDTT), Phase 1. Prehistoric and post-Roman pottery and post-medieval glass assessment",Prehistoric and post-Roman pottery and post-medieval glass assessment (Phase 1) for trial trench evaluation works at Dews Farm ,AUTHOR,Lyn ,Blackmore,MOLA HEADLAND INFRASTRUCTURE,4,01/10/2020,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_Phase_1_Sample_registers.pdf,Sample register (Phase 1) for 1C18CVDTT,Scanned copy of the original sample register (Phase 1),CREATOR,Marit ,Leenstra,MOLA HEADLAND INFRASTRUCTURE,5,12/10/2021,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_Phase_1_Sections_sheets.pdf,Sections sheet (Phase 1) for 1C18CVDTT,Scanned copy of the original sections sheet (Phase 1) ,CREATOR,Marit ,Leenstra,MOLA HEADLAND INFRASTRUCTURE,20,12/10/2021,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_Phase_1_TT_log_sheets_and_Context_record_sheets.pdf,Trial trench log sheets and context record sheets (Phase 1) for 1C18CVDTT,Scanned copy of the original trial trench log sheets and context record sheets (Phase 1),CREATOR,Marit ,Leenstra,MOLA HEADLAND INFRASTRUCTURE,369,12/10/2021,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_PHASE_1+2_photo_registers.pdf,Photo registers (Phase 1 and 2) for 1C18CVDTT,Scanned copy of the original photo registers (Phase 1 and 2),CREATOR,Marit ,Leenstra,MOLA HEADLAND INFRASTRUCTURE,25,29/09/2021,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_PHASE_2_context_sheets_1.pdf,Contexts sheets 1 (Phase 2) for 1C18CVDTT,Scanned copy of the original context sheets (1),CREATOR,Marit ,Leenstra,MOLA HEADLAND INFRASTRUCTURE,32,13/09/2021,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_PHASE_2_context_sheets_2.pdf,Context sheets 2 (Phase 2) for 1C18CVDTT,Scanned copy of the original context sheets (2),CREATOR,Marit ,Leenstra,MOLA HEADLAND INFRASTRUCTURE,46,13/09/2021,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_PHASE_2_photo_registers.pdf,Photo registers (Phase 2) for 1C18CVDTT,Scanned copy of the original photo registers (Phase 2),CREATOR,Marit ,Leenstra,MOLA HEADLAND INFRASTRUCTURE,5,29/09/2021,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_PHASE_2_registers.pdf,Photo registers (Phase 2) for 1C18CVDTT,Scanned copy of the original photo registers (Phase 2),CREATOR,Marit ,Leenstra,MOLA HEADLAND INFRASTRUCTURE,5,12/10/2021,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_phases_2_and_3_flint_specialist_report.pdf,"HS2 Central, Dew's Farm (1C18CVDTT), Phases 2 and 3. Flint assessment",Flint assessment (Phases 2-3) for trial trench evaluation works at Dews Farm ,AUTHOR,Yvonne ,Wolframm-Murray,MOLA HEADLAND INFRASTRUCTURE,2,01/10/2020,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_phases_2_and_3_flint_specialist_tables.pdf,"HS2 Central, Dew's Farm (1C18CVDTT), Phases 2 and 3. Lithics report rables",Lithics report rables (Phases 2-3) for trial trench evaluation works at Dews Farm ,AUTHOR,Yvonne ,Wolframm-Murray,MOLA HEADLAND INFRASTRUCTURE,4,01/10/2020,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_Phases_2_and_3_SF_Nails_Slag_Plastic_specialist_report.pdf,"HS2 Central, Dew's Farm (1C18CVDTT), Phases 2 and 3. Roman, medieval, modern and undated registered small finds, bulk iron nails, slag and plastic assessment. November 2020","Roman, medieval, modern and undated registered small finds, bulk iron nails, slag and plastic assessment (Phases 2-3) for trial trench evaluation works at Dews Farm ",AUTHOR,Michael ,Marshall,MOLA HEADLAND INFRASTRUCTURE,4,01/11/2020,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_Photo_Register.odt,Photo register for 1C18CVDTT,Digital version of the original photo register ,CREATOR,Marit ,Leenstra,MOLA HEADLAND INFRASTRUCTURE,2,12/10/2021,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_Photo_Registers_cam7.pdf,Photo registers (Camera 7) for 1C18CVDTT,Scanned copy of the original photo registers (Camera 7),CREATOR,Marit ,Leenstra,MOLA HEADLAND INFRASTRUCTURE,2,07/08/2020,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_Photos_register.pdf,Photo register for 1C18CVDTT,Scanned copy of the original photo register ,CREATOR,Marit ,Leenstra,MOLA HEADLAND INFRASTRUCTURE,1,12/10/2021,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_Photos_registers.pdf,Photo registers for 1C18CVDTT,Scanned copy of the original photo registers,CREATOR,Marit ,Leenstra,MOLA HEADLAND INFRASTRUCTURE,3,12/10/2021,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_Sample_registers.pdf,Sample registers for 1C18CVDTT,Scanned copy of the original sample registers ,CREATOR,Marit ,Leenstra,MOLA HEADLAND INFRASTRUCTURE,2,12/10/2021,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_Section_sheet.pdf,Section sheet for 1C18CVDTT,Scanned copy of the original section sheet,CREATOR,Marit ,Leenstra,MOLA HEADLAND INFRASTRUCTURE,1,12/10/2021,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_Sections_sheets.pdf,Sections sheet 1C18CVDTT,Scanned copy of the original sections sheet ,CREATOR,Marit ,Leenstra,MOLA HEADLAND INFRASTRUCTURE,3,12/10/2021,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 Sections_sheets.pdf,Section sheets,Scanned copy of the original section sheets,CREATOR,Mike,Curnow ,MOLA HEADLAND INFRASTRUCTURE,2,14/03/2021,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_Trench_sheets_and_Context_record_sheets.pdf,Trial trench sheets and context record sheets 1C18CVDTT,Scanned copy of the original trial trench sheets and context record sheets,CREATOR,Marit ,Leenstra,MOLA HEADLAND INFRASTRUCTURE,80,12/10/2021,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_Trial_trench_log_sheets.pdf,Trial trench log sheets,Scanned copy of the original tiral trench log sheets,CREATOR,Mike,Curnow ,MOLA HEADLAND INFRASTRUCTURE,5,14/03/2021,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_trial_trench_logs.pdf,Trial trench log sheets for 1C18CVDTT,Scanned copy of the original trial trench log sheets,CREATOR,Marit ,Leenstra,MOLA HEADLAND INFRASTRUCTURE,179,13/09/2021,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1C18CVDTT_TT_log_sheets.pdf,Trial trench log sheets for 1C18CVDTT,Scanned copy of the original trial trench log sheets,CREATOR,Marit ,Leenstra,MOLA HEADLAND INFRASTRUCTURE,36,12/10/2021,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1EW03-FUS_MHI-EV-REP-CS01_CL02-000015_Ver3.pdf,"AWHd - Interim report for trial trenching Phase 3 at Dews Farm, Harvil Road, Hillingdon, C10019","An archaeological test pit and trial trench evaluation was undertaken by MOLA in three areas (Hillingdon Outdoor Activity Centre, Dews Farmhouse, and Hillingdon Farm) all part of the land parcel C10019, Dews Farm (the Site). The site code allocated for the works was 1C18CVDTT, centred on NGR 505794 187796. This interim report covers the Phase 3 of the project which comprised 6 trial trenches in the Hillingdon Outdoor activity centre and adjacent walled garden.",CREATOR,Mike,Curnow ,MOLA HEADLAND INFRASTRUCTURE,24,14/01/2021,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5 1EW03-FUS-EV-REP-CS01_CL01-001866_C02_Location_Specific_Written_Scheme_of_Investigation_for_Trial_Trench_Investigations_for_Dews_Farm_AC100-W2.pdf,"Location specific written scheme of investigation for test pit and trial trench investigations for Dews Farm, Colne Valley, South Embankment ","This Location specific written scheme of investigation (LSWSI) sets out the methodology, deliverables, programme, health, safety and environmental requirements, resources and interfaces necessary to deliver an archaeological evaluation defined in the Project Plan for Test Pit and Trial Trench Investigations for Dews Farm Colne Valley South Embankment (AC100/3). The Project Plan established the scope, aims, contribution to the Generic Written Scheme of Investigation: Historic Environment Research and Delivery Strategy (GWSI: HERDS) objectives, techniques, deliverable and reporting mechanism for the trial trench investigation. The archaeological artefact collection and trial trench evaluation will be undertaken on land located east of Dews Farm. This evaluation encompasses four parcels of land: C10019 (NGR centre 505758 187837), C10033 (NGR centre 5055331 187227), C10034 (NGR centre 505278 187065), and C10035 (NGR centre 505159 186569)",AUTHOR,Alan ,Ford,MOLA HEADLAND INFRASTRUCTURE,59,23/11/2018,MOLA HEADLAND INFRASTRUCTURE,,,,,,English,Adobe Acrobat,9.5