Thompson, B. (1995). Comment. Ind Archaeol News 94. Vol 94.
Title The title of the publication or report |
Comment | |
---|---|---|
Issue The name of the volume or issue |
Ind Archaeol News 94 | |
Series The series the publication or report is included in |
Industrial Archaeology News | |
Volume Volume number and part |
94 | |
Biblio Note This is a Bibliographic record only. |
Please note that this is a bibliographic record only, as originally entered into the BIAB database. The ADS have no files for download, and unfortunately cannot advise further on where to access hard copy or digital versions. | |
Publication Type The type of publication - report, monograph, journal article or chapter from a book |
Journal | |
Abstract The abstract describing the content of the publication or report |
Questions the conservation ethics of a restoration scheme being undertaken by Calderdale MBC on the Rochdale Canal between Todmorden and Hebden Bridge (West Yorkshire). The work is altering the way a lock functions and is allegedly being done without listed building consent. Work on the Black Pits aqueduct is also criticised for its use of inappropriate materials. | |
Year of Publication The year the book, article or report was published |
1995 | |
Locations Any locations covered by the publication or report. This is not the place the book or report was published. |
|
|
Source Where the record has come from or which dataset it was orginally included in. |
BIAB
(The British Archaeological Bibliography (BAB))
|
|
Created Date The date the record of the pubication was first entered |
20 Jan 2002 |