Title: |
Olympic, Paralympic and Legacy Transformations Planning Applications: Waterways and Associated Built Heritage Structures, City Mill River footbridge Stratford; Built Heritage survey |
Series: |
Museum of London Archaeology unpublished report series
|
Downloads: |
|
Licence Type: |
ADS Terms of Use and Access
|
DOI |
|
Publication Type: |
Report (in Series)
|
Abstract: |
A footbridge running from W to E over the canalised City Mill River, just S of its junction with the River Lea, was constructed of riveted steel components. A curved central section, with lattice girder sides joined overhead and stiffened radially, was supported by straight end sections, with plate sides narrowing to the ends and stiffened vertically. Tubular steel handrails compensated for the narrowing ends. The larger flanges were stamped 'GKB PT BRITISH STEEL [?CO]NSETT', and the bridge was probably constructed between 1967 and 1980. A Level 1 record was made of the bridge, resulting in a sketch elevation, sketches of details, a short written description and photographs of the bridge and its setting. |
Author: |
K Bower
|
Publisher: |
MOLA (Museum of London Archaeology)
|
Other Person/Org: |
Historic England (OASIS Reviewer)
Greater London HER (OASIS Reviewer)
|
Year of Publication: |
2008
|
Locations: |
Site: |
City Mill River footbridge, stratford |
Parish: |
STRATFORD |
District: |
Newham |
County: |
Greater London |
Country: |
England |
Location - Auto Detected: |
River Lea |
Grid Reference: 537654, 184348 (Easting, Northing)
|
|
Subjects / Periods: |
|
Identifiers: |
|
Note: |
A4 word document; Text and Color illustrations and photographic figures, colour cover
|
Source: |
|
Relations: |
|
Created Date: |
25 Nov 2016 |