Title: |
Central Park Primary School: Historic Building Assessment |
Series: |
Compass Archaeology unpublished report series
|
Downloads: |
compassa1-152707_1.pdf (4 MB)
:
|
Download
|
|
Licence Type: |
ADS Terms of Use and Access
|
DOI |
|
Publication Type: |
Report (in Series)
|
Abstract: |
In May 2013 Compass Archaeology was commissioned to produce a historic building assessment of Kensington Primary School on behalf of Newham Borough Council. The assessment has been produced in support of a planning application for the redevelopment of the school, including the construction of a new floor and roof, and extension of 1980s buildings to join up with the historic building. This assessment has concluded that the majority of the building dates from its original construction in 1899, with the exception of the loss of the upper-storey and roof following a fire in 1979. It is concluded that the current proposals for the redevelopment of this school will not have a major impact on the historic integrity of the structure, or on any of the original features within it. Attempts should be made to try to 'fit' any changes made into the current building as successfully as possible, particularly with the new roof which should be designed in such a way to fit visually with the existing building. |
Author: |
E Jeffery
|
Publisher: |
Compass Archaeology Ltd
|
Other Person/Org: |
Historic England (OASIS Reviewer)
Please note: this record has been validated by-proxy by Historic England.
|
Year of Publication: |
2013
|
Locations: |
Site: |
Central Park Primary School |
Parish: |
EAST HAM |
District: |
Newham |
County: |
Greater London |
Country: |
England |
Location - Auto Detected: |
Kensington Primary School |
Location - Auto Detected: |
Newham |
Grid Reference: 541895, 183133 (Easting, Northing)
|
|
Subjects / Periods: |
|
Identifiers: |
OASIS Id: |
compassa1-152707 |
|
Note: |
Report detailing the results of the historic building assessment. Including photographs, floor-plans and phased floor-plans, discussion of original features, and discussion of the impact of the proposals on the building.
|
Source: |
|
Relations: |
|
Created Date: |
25 Nov 2016 |