skip to navigation
ADS Main Website
Help
|
Login
/
Browse by Series
/ Series
Series: AECOM unpublished report series
Aecom
ADS Digital Resource
Primary Contact
: Aecom:
email
Associated Organisation
:
AECOM
Browse
Statistics
Search
Series Publication Type:
Publisher:
AECOM
Year of Publication (Start):
2016
Year of Publication (End):
2018
Records per page:
10
20
50
100
200
Go
Previous
Page 1 of 1
Next
Filter results by issue title, e.g. 'roman military station'
Filter:
Go
Please click on an Issue link to go to the Issue Details.
Issue Title
Access Type
Publication
Type
Author / Editor
Abstract
Publication
Year
Ferrybridge 'C' Power Station; Building Recording of Barge Unloader and Coal Handling System
G Scott
1.1 AECOM Infrastructure and Environment Ltd (AECOM) was commissioned by SSE Generation Ltd (SSE) to undertake a Level 2 Building Recording and drone survey of the barge unloader and coal handling facilities at Ferrybridge 'C' power station (Figure 1). The building recording seeks to mitigate the impact of the demolition of the power station, including removal of the barge unloader, under a prior approval. The buildings within the power station, including the barge unloader, were assessed for designation in October 2015 when it was announced that the power station was due to close. The decision was taken not to designate the power station. Further to that, the power station was granted a Certificate of Immunity from Listing (COI) in July 2017 (NHLE: 1448208). A condition for building recording of the barge unloader was placed on the approval for demolition.
2019
Ferrybridge 'C' Power Station; Building Recording of the Main Station
G Scott
AECOM Infrastructure and Environment Ltd (AECOM) was commissioned by SSE Generation Ltd (SSE) to undertake a Level 2 Building Recording Ferrybridge 'C' power station (Figure 1). The building recording seeks to mitigate the impact of the demolition of the power station. The buildings were assessed for designation in October 2015 when it was announced that the power station was due to close. The decision was taken not to designate the power station. Further to that, the power station was granted a Certificate of Immunity from Listing (COI) in July 2017 (NHLE: 1448208). The site is located on the River Aire, near Knottingley in West Yorkshire (centred on NGR: SE 47473 24777). Ferrybridge is one of three coal-fired power stations built in this area, the other two being Eggborough and Drax.
2019
Hartcliffe Campus. Historic Environment Desk-based Assessment
O J Prestidge
AECOM has been commissioned by Bristol City Council (BCC), to complete a Historic Environment Desk-based Assessment (DBA). The assessment forms part of a BCC planning application, intended for submission in 2018, for the redevelopment of Hartcliffe Campus, Bristol to deliver a predominantly residential-led scheme.
2018
Victory Road, Derby: Historic Building Recording
A M Jones
Historic Building Recording of sports pavilion and HSBC Bank within Rolls-Royce Ltd SInfin site