Title: |
Shaft Capping, Contract 9A. Mitigation Recording |
Number of Pages: |
25 |
Biblio Note |
Please note that this is a bibliographic record only, as originally entered into the BIAB database.
The ADS have no files for download, and unfortunately cannot advise further on where to access hard copy or digital versions.
|
Publication Type: |
Report
|
Abstract: |
An archaeological assessment report outlined the mining history, identified archaeologically sensitive areas, and recommended the provision of an archaeological watching brief during Land Reclamation Works in Kerrier District. In 1996 watching briefs were maintained during mine shaft treatment works. The shafts related to the following mines; Wheal Treasury, Great Western, Wheal Penrose and South Wheal Frances. Surface works at Ruby Terrace at Porkellis were also dealt with. [AIP] |
Author: |
Colin Buck
|
Publisher: |
Cornwall Archaeological Unit
|
Year of Publication: |
1997
|
Note: |
Date Of Issue From:
1997
Date Of Coverage From:
01
Date Of Coverage To:
01
Editorial Expansion:
Site name: SHAFT CAPPING, CONTRACT 9A, MITIGATION RECORDING Study area: Investigation type: Post-determination/Research District: Kerrier Monument: SHAFT. Post-medieval (1540-1901) Ngr: SW69303290 Parish: Postcode:
|
Source: |
BIAB
(Archaeological Investigations Project (AIP))
|
Created Date: |
19 Jan 2009 |