Title: |
LG Marine Archaeology Discard Strategy July2011 |
Series: |
Wessex Archaeology unpublished report series
|
Number of Pages: |
2 |
Downloads: |
72437_LG_Discard_Strategy_July2011.pdf (19 kB)
:
|
Download
|
|
Licence Type: |
ADS Terms of Use and Access
|
Publication Type: |
Report (in Series)
|
Abstract: |
Wessex Archaeology (WA) has been commissioned by London Gateway Port Ltd. (LGPL) to provide archaeological services in respect of marine works in the course of developing London Gateway Port and its associated dredged channel.This discard strategy has been developed on the basis of practical experience of the material archive arising from pre-dredge investigations for London Gateway in the period 2001-2008. The strategy was outlined in Appendix III of London Gateway: Post-Fieldwork Assessment (Jan 2010; WA Ref: 72430.02; LG-WSA-ENV-CEP-C7013-ARC-3000 REV 01). The strategy was confirmed and further developed at a meeting with Southend Museums Service (SMS) on 6 April 2011. The strategy provided guidance on the discard of material recovered during the dredging process and was proposed to be adopted from March 2010 onwards. |
Author: |
|
Publisher: |
Wessex Archaeology
|
Year of Publication: |
2011
|
Source: |
ADS Archive
(ADS Archive)
|
Relations: |
|
Created Date: |
10 Dec 2020 |