Title: |
Monitoring of Geotechnical Investigations, Full Sutton to Stamford Bridge Pipeline, East Riding of Yorkshire |
Series: |
ECUS Ltd unpublished report series
|
Downloads: |
ecusltd1-511907_193853.pdf (4 MB)
:
|
Download
|
|
Biblio Note |
This report was uploaded to the OASIS system by the named Publisher. The report has not been reviewed by the relevant HER. The report has been transferred into the ADS Library for public access and to facilitate future research.
|
Licence Type: |
ADS Terms of Use and Access
|
DOI |
|
Publication Type: |
Report (in Series)
|
Abstract: |
Ecus Ltd was commissioned by Morrison Water Services, on behalf of Yorkshire Water, to carry out archaeological monitoring of geotechnical investigations along the route of a new wastewater pipeline between Full Sutton and Stamford Bridge, East Riding of Yorkshire. The works comprised a watching brief during excavation of nine trial holes (machine-excavated test pits) and five hand-dug borehole starter pits. No archaeological features or deposits were identified during the monitoring programme, and no significant artefacts were recovered. None of the excavated trial holes or boreholes were located in areas where archaeological remains had been anticipated, based on the findings of the desk-based assessment and geophysical survey. The negative results from the monitoring of the ground investigation works supported this conclusion. |
Author: |
Greg P Speed
|
Publisher: |
ECUS ltd
|
Year of Publication: |
2022
|
Locations: |
County: |
East Riding of Yorkshire |
Parish: |
Stamford Bridge |
District: |
East Riding of Yorkshire |
Country: |
England |
Grid Reference: 472369, 454746 (Easting, Northing)
|
|
Subjects / Periods: |
|
Identifiers: |
OASIS Id: |
ecusltd1-511907 |
|
Source: |
|
Relations: |
|
Created Date: |
19 Jan 2024 |