Data copyright © High Speed Two Ltd. unless otherwise stated
This work is licensed under a The Open Government Licence (OGL).
High Speed Two Ltd.
2 Snowhill
Queensway
Birmingham
B4 6GA
United Kingdom
Tel: 08081 434 434
Reports | Images | Spreadsheets | GIS | Site Records
OASIS Report(s)
Stafford, Louis (2019). Fieldwork Report of Trial Trench Evaluation at Ellesborough Road Hospital, Wendover Green Tunnel, Buckinghamshire. High Speed Two Ltd.. https://doi.org/10.5284/1119024. | Go to report |
Title: Text metadata Filename: 1C18ERHTT_ADS_text_metadata.csv (3 kB) |
CSV |
Info
Download |
Title: Stafford, L.
(2019)
Fieldwork Report for Trial Trenching at C21015 Ellesborough Road Hospital – Wendover Green Tunnel – Wendover – Buckinghamshire (AC210/9).
Filename: 1C18ERHTT_FieldworkReport.pdf (18 MB) |
|
Info
Download |
|
Title: Stafford, L.
(2019)
Interim Report for Trial Trenching at Ellesborough Road Hospital - Wendover Green Tunnel– Wendover - Buckinghamshire(AC210/9).
Filename: 1C18ERHTT_InterimReport.pdf (5 MB) |
|
Info
Download |
|
Title: Stafford, L.
(2019)
Summary Report for Trial Trenching at C21015 Ellesborough Road Hospital – Wendover Green Tunnel – Wendover - Buckinghamshire (AC210/9).
Filename: 1C18ERHTT_SummaryReport.pdf (123 kB) |
|
Info
Download |
|
Title: Morgan, R.
(2019)
Survey Report for Trial Trenching at Ellesborough Road Hospital – Wendover Green Tunnel – Wendover - Buckinghamshire (AC210/9).
Filename: 1C18ERHTT_SurveyReport.pdf (5 MB) |
|
Info
Download |