Data copyright © High Speed Two Ltd. unless otherwise stated
This work is licensed under a The Open Government Licence (OGL).
High Speed Two Ltd.
2 Snowhill
Queensway
Birmingham
B4 6GA
United Kingdom
Tel: 08081 434 434
Reports | Images | CAD (Vector graphics) | Spreadsheets | GIS | Site Records
OASIS Report(s)
The project report WP 29 (A) Historic Environment Works‐ Balsall Common– Enabling Works North Contract Report: Trial Trenching (OASIS ID: hs2wesse1-345859) associated with this archive is ready for archiving and will be released shortly. |
Title: Text metadata Filename: hs2wesse1-345859_203450_Text_Metadata.csv (1 kB) |
CSV |
Info
Download |
Title: Rajic, M.
(2018)
WP 22 Balsall Common Location Specific Written Scheme of Investigation for Trial Trenching – Enabling Works North.
HS2 Ltd
: Sheffield.
Filename: 203450_WSI.pdf (1 MB) Description: This High Speed 2 (HS2) North Section Phase One Location Specific Written Scheme of Investigation (LS‐WSI) sets out the detailed method of investigation for trial trenching at Balsall Common in Solihull District Council, Warwickshire (‘the site’) as required by Project Plan for Trial Trenching (1EW04‐LMJ‐EV‐REP‐NS01_NL01‐022008). |
|
Info
Download |