Data copyright © Jennifer Proctor unless otherwise stated
This work is licensed under a Creative Commons Attribution 4.0 International License.
Pre-Construct Archaeology Ltd Durham
The Rope Works
Broadwood View
Chester-le-Street
Durham
DH3 3AF
United Kingdom
Tel: 0191 377 1111
This collection comprises images from a historic building recording survey at Queen Elizabeth High School, Hexham, Northumberland, undertaken in 2020, by Pre-Construct Archaeology Limited (PCA).
Pre-Construct Archaeology Limited was commissioned by Silverstone Building Consultancy on behalf of Galliford Try Building (North East and Yorkshire), to undertake historic building recording of the Walled Garden at Queen Elizabeth High School, Hexham, Northumberland. A programme of archaeological work comprising Historic Building Recording was required as a condition of the planning consent. This scheme of works details the findings of the Level 3 Historic Building Recording of the walled garden and associated structures.
A Historic Building Recording detailing the Level 2/3 Historic Building Recording of Westfield House, the Hydro Hotel, Winter Gardens, and the Groundkeeper's Cottage was undertaken as a separate scheme of works and can be found in OASIS entry preconst1-390656.