This page (revision-12) was last changed on 30-Jul-2012 12:15 by Administrator

This page was created on 25-Jul-2012 16:12 by Jo Gilham

Only authorized users are allowed to rename pages.

Only authorized users are allowed to delete pages.

Page revision history

Version Date Modified Size Author Changes ... Change note
12 30-Jul-2012 12:15 8 KB Administrator to previous
11 26-Jul-2012 13:47 8 KB Administrator to previous | to last
10 26-Jul-2012 12:51 8 KB Administrator to previous | to last
9 25-Jul-2012 16:30 8 KB Administrator to previous | to last
8 25-Jul-2012 16:29 8 KB Administrator to previous | to last
7 25-Jul-2012 16:27 8 KB Administrator to previous | to last
6 25-Jul-2012 16:26 8 KB Administrator to previous | to last
5 25-Jul-2012 16:23 8 KB Administrator to previous | to last
4 25-Jul-2012 16:19 8 KB Jo Gilham to previous | to last
3 25-Jul-2012 16:18 8 KB Jo Gilham to previous | to last
2 25-Jul-2012 16:17 8 KB Jo Gilham to previous | to last
1 25-Jul-2012 16:12 8 KB Jo Gilham to last

Page References

Incoming links Outgoing links

Version management

Difference between version and

At line 3 added 3 lines
[{Image src='AArchives_v2-sect2.png' align='right' }]
At line 29 changed one line
\\Start-up
\\__Start-up__
At line 31 changed one line
\\Initiation
\\__Initiation__
At line 33 changed one line
\\Execution
\\__Execution__
At line 40 changed one line
Curation
__Curation__
At line 60 changed one line
#the Project Executive produces a project proposal that
#the __''Project Executive''__ produces a project proposal that
At line 66 changed one line
#the Project Team produces a project design that
#the __''Project Team''__ produces a project design that
At line 72 changed 2 lines
#the Project Executive monitors the project design against the brief and agrees the project design
#the Consultant ensures their client comprehends the project proposal, the project design and the requirement to produce a stable, ordered accessible archive.
#the __''Project Executive''__ monitors the project design against the brief and agrees the project design
#the __''Consultant''__ ensures their client comprehends the project proposal, the project design and the requirement to produce a stable, ordered accessible archive.
At line 77 changed 21 lines
o the Project Executive monitors the project to ensure that standards are being met and certifies completion
o the Project Team ensures that standards are maintained by
1. establishing systems for managing documents, drawings, film, photographs, digital material, finds and samples to protect from loss or damage, and to make them accessible
2. establishing systems for collecting and managing finds and other materials, including selection, sorting, cleaning, marking, recording and packing
3. using appropriate materials
4. applying consistent terminology when making records
5. documenting analytical and interpretative activities to ensure that all procedures and terminologies can be clearly understood
6. arranging for creation of security copies of documents, drawings and digital material as appropriate
7. preserving draft versions of reports for inclusion in the archive as appropriate
8. consulting representatives of the archive repository as necessary
Prepares the project archive for transfer by
1. marking archive storage materials appropriately
2. packing archive material appropriately
3. ensuring archive components are indexed
4. compiling a contents list
Arranges transfer of title and copyright.
Arranges for the deposition of security copies of the archive as appropriate.
o the Consultant maintains a balance between the requirements of their client and the aims of the project, ensuring that the quality of the archive is not compromised
o the Curator monitors the project as appropriate, ensuring that the condition and security of archive material is maintained
Advises on retention and disposal strategies as necessary (See Appendix III).
Receives the archive and finalises transfer of title and copyright
*the __''Project Executive''__ monitors the project to ensure that standards are being met and certifies completion
*the __''Project Team''__ ensures that standards are maintained by
*#establishing systems for managing documents, drawings, film, photographs, digital material, finds and samples to protect from loss or damage, and to make them accessible
*#establishing systems for collecting and managing finds and other materials, including selection, sorting, cleaning, marking, recording and packing
*#using appropriate materials
*#applying consistent terminology when making records
*#documenting analytical and interpretative activities to ensure that all procedures and terminologies can be clearly understood
*#arranging for creation of security copies of documents, drawings and digital material as appropriate
*#preserving draft versions of reports for inclusion in the archive as appropriate
*#consulting representatives of the archive repository as necessary
*Prepares the project archive for transfer by
*#marking archive storage materials appropriately
*#packing archive material appropriately
*#ensuring archive components are indexed
*#compiling a contents list
*Arranges transfer of title and copyright.
*Arranges for the deposition of security copies of the archive as appropriate.
*the __''Consultant''__ maintains a balance between the requirements of their client and the aims of the project, ensuring that the quality of the archive is not compromised
*the __''Curator''__ monitors the project as appropriate, ensuring that the condition and security of archive material is maintained
*Advises on retention and disposal strategies as necessary (See Appendix III).
*Receives the archive and finalises transfer of title and copyright
At line 100 changed one line
o the Curator ensures correct standards of storage and care and makes the archive available for use
*the __'Curator'__ ensures correct standards of storage and care and makes the archive available for use